# Last 24 hours | # Last 24 hours | ||
− | #* 11:45am: 5th pass separator cable melting [https://logbooks.jlab.org/entry/3824117] | + | #* 11:45am: 5th pass separator cable melting [https://logbooks.jlab.org/entry/3824117], [https://logbooks.jlab.org/entry/3824468] |
#* 7:45pm: beam returned, continued production running | #* 7:45pm: beam returned, continued production running | ||
#* 4:00am: 5th pass separator trip, crew chief gives Hall D priority with magnetic separation | #* 4:00am: 5th pass separator trip, crew chief gives Hall D priority with magnetic separation | ||
Line 12: | Line 12: | ||
# Reports/Issues | # Reports/Issues | ||
# Run plan | # Run plan | ||
+ | #* Maintenance day: | ||
+ | #** Intervention on TagM (Richard, Nick, Chris) deferred? | ||
+ | #** Installation of test crystals (Sasha) | ||
+ | #** Work on GEM TRD (Lubomir) | ||
+ | #** FCal base replacements (Mark) | ||
== Monday, August 10 == | == Monday, August 10 == |
Revision as of 08:10, 11 August 2020
<- Back to Run Coordination Meetings:Summer2020
Tuesday, August 11
- Last 24 hours
- Reports/Issues
- Run plan
- Maintenance day:
- Intervention on TagM (Richard, Nick, Chris) deferred?
- Installation of test crystals (Sasha)
- Work on GEM TRD (Lubomir)
- FCal base replacements (Mark)
- Maintenance day:
Monday, August 10
- Last 72 hours
- Beam returned Saturday 4am
- Harp scan, initially problems with GUI settings
- DAQ/HOSS problems: [3], [4] (Saturday morning)
- Start of 350nA production cycle on Saturday day shift, but beam tuning to A ongoing [5]
- Saturday swing: AC bias testing, [6], status
- MCC confused about FSD trip and goniometer movements: [7]
- Sunday 1pm: Cryoleak in 1L20, tripped pump, beam restored at 10pm
- Harp scan: [8], [9], [10]
- Completed first full cycle of 4 orientations + amorphous
- DAQ problems on Monday morning: [11], [12], log files from moving to tape fill up disk, Sergey will work on a system to prevent this
- Reports/Issues
- Coherent edge for -45/45: [13]
- Problem with trigger rate archiving [14]
- Monitoring: Saturday 5pm, Sunday 5am, Sunday 5pm, Monday 5am
- Run Plan
- Continue production
- Maintenance day on Tuesday:
- Intervention on TagM (Richard, Chris)
- Installation of test crystals (Sasha)
- Work on GEM TRD (Lubomir)
Friday, August 7
- Last 24 hours
- Diamond alignment check (Hovanes)
- Coherent edges are reproducible to about 20 MeV, tweaking may be necessary
- Add screen shots of the coherent edges to logbook
- "force para" or "force perp", as appropriate, and "save as default" for each of the four settings
- Trigger check-out (Sasha)
- TagH and PS HV scan, interrupted by pass change
- Storm, optics tuning, several issues, transformer repair
- No beam since, expected only this afternoon
- Diamond alignment check (Hovanes)
- Reports/Issues
- Remind MCC to put in dumplet when changing radiators
- BCal Pulser?
- Monitoring:
- CPP Status
- Run Plan
- Access?
- Harp Scan
- Complete first production cycle with 350nA
Thursday, August 6
- Last 24 hours
- 5th pass separator problems after thunderstorm in the evening
- Beam recovered around midnight
- Harp scan: results
- Radiation levels checked: similar to spring
- Reports/Issues
- TagM was set to high gain mode during night, saturates, no meaningful data [15]
- Diamond alignment: coherent edge too far off (Beni)
- Bleed through from Hall B
- Run Plan
- Diamond alignment (Hovanes)
- Trigger, PS, TagH check (Sasha)
- Pass change at noon