Difference between revisions of "July 09, 2020 CPP Design Meeting"
From GlueXWiki
(→Agenda) |
(→Meeting Time and Place =) |
||
Line 3: | Line 3: | ||
Bluejeans https://bluejeans.com/735541157/3638?src=calendarLink | Bluejeans https://bluejeans.com/735541157/3638?src=calendarLink | ||
− | * Present - Elton, Dave, Bobby, Ilya, Rory (remote) | + | * Present - Elton, Dave, Bobby, Ilya, Eugene, Rory (remote) |
== Agenda == | == Agenda == | ||
* Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/June_18,_2020_CPP_Design_Meeting | * Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/June_18,_2020_CPP_Design_Meeting | ||
− | + | * Upcoming run, possible testschedule [[Media:CPP_Tests_Aug2020.pdf]] | |
− | + | ||
− | + | ||
− | + | ||
− | * Upcoming run, possible | + | |
Assume that nominal the GlueX configuration consists of | Assume that nominal the GlueX configuration consists of | ||
* No Pb shielding | * No Pb shielding | ||
Line 21: | Line 17: | ||
* DIRC removed | * DIRC removed | ||
* Solenoid field at 1350 A (no change) | * Solenoid field at 1350 A (no change) | ||
− | |||
** CPP test DAQ setup: 2 hrs | ** CPP test DAQ setup: 2 hrs | ||
** Repeat measurement with nominal GlueX configuration: 2 hrs | ** Repeat measurement with nominal GlueX configuration: 2 hrs | ||
− | ** Configure experiment for CPP Test: | + | ** Configure experiment for CPP Test: 12 hours |
** Start with no DIRC, no shielding | ** Start with no DIRC, no shielding | ||
** Take data: 2 hours | ** Take data: 2 hours | ||
− | ** Install Pb shielding: | + | ** Install Pb shielding: 2 hours |
+ | ** Take data: 2 hours | ||
+ | ** Install 2 Pb shields: 2 hours | ||
** Take data: 2 hours | ** Take data: 2 hours | ||
− | ** Restore nominal GlueX configuration: | + | ** Restore nominal GlueX configuration: 4 hours. |
− | Total time = | + | Total time = 30 hours |
* Things to work out | * Things to work out |
Revision as of 08:19, 10 July 2020
Meeting Time and Place =
Thursday July 09, 2020, 1:30pm Bluejeans https://bluejeans.com/735541157/3638?src=calendarLink
- Present - Elton, Dave, Bobby, Ilya, Eugene, Rory (remote)
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/June_18,_2020_CPP_Design_Meeting
- Upcoming run, possible testschedule Media:CPP_Tests_Aug2020.pdf
Assume that nominal the GlueX configuration consists of
- No Pb shielding
- DIRC installed
- Solenoid field at 1350 A
CPP Test Configuration
- With and without Pb shielding
- DIRC removed
- Solenoid field at 1350 A (no change)
- CPP test DAQ setup: 2 hrs
- Repeat measurement with nominal GlueX configuration: 2 hrs
- Configure experiment for CPP Test: 12 hours
- Start with no DIRC, no shielding
- Take data: 2 hours
- Install Pb shielding: 2 hours
- Take data: 2 hours
- Install 2 Pb shields: 2 hours
- Take data: 2 hours
- Restore nominal GlueX configuration: 4 hours.
Total time = 30 hours
- Things to work out
- Gas line manifold
- Adjustable lead absorber
- Alignment hardware
- Complete structural analysis
- Develop Detailed installation plan
- Develop Design/operational/Maintenance Requirements
Minutes and Action Items
- Reviewed minutes of last meeting
- Set up new meeting in 2 weeks