July 09, 2020 CPP Design Meeting
From GlueXWiki
Meeting Time and Place
Thursday July 09, 2020, 1:30pm Bluejeans https://bluejeans.com/735541157/3638?src=calendarLink
- Present - Elton, Dave, Bobby, Ilya, Eugene, Rory (remote)
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/June_18,_2020_CPP_Design_Meeting
- Upcoming run, possible testschedule Media:CPP_Tests_Aug2020.pdf
Assume that nominal the GlueX configuration consists of
- No Pb shielding
- DIRC installed
- Solenoid field at 1350 A
CPP Test Configuration
- With and without Pb shielding
- DIRC removed
- Solenoid field at 1350 A (no change)
Screenshots of test layout media:CPP_Testconfig.jpg media:CPP_Testconfig2.jpg media:CPP_Testconfig3.jpg media:CPP_Testconfig4.jpg media:CPP_Testconfig5.jpg media:CPP_Testconfig6.jpg
Possible sequence and times
- CPP test DAQ setup: 2 hrs
- Repeat measurement with nominal GlueX configuration: 2 hrs
- Configure experiment for CPP Test: 12 hours max
- Start with no DIRC, no shielding
- Take data: 2 hours
- Install Pb shielding: 2 hours
- Take data: 2 hours
- Install 2 Pb shields: 2 hours
- Take data: 2 hours
- Restore nominal GlueX configuration: 4 hours.
Total time = 30 hours
The DIRC will have to be surveyed following the test.
Note by Elton: An updated schedule can be found in CPP Test 2020 - Schedule
- Things to work out
- Gas line manifold
- Adjustable lead absorber
- Alignment hardware
- Complete structural analysis
- Develop Detailed installation plan
- Develop Design/operational/Maintenance Requirements
Minutes and Action Items
- Reviewed minutes of last meeting
- Bobby presented the configuration and the process was discussed - generally ok
- Need to add platform to set lead on so 1 person can change it
- Elton will obtain approval from Eugene to procure/build components
- Set up new meeting in 2 weeks