Line 25: | Line 25: | ||
* COMCAL tests, TAC running, etc. | * COMCAL tests, TAC running, etc. | ||
* Preparations for PAC meeting (jeopardy) | * Preparations for PAC meeting (jeopardy) | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Arshak,Igal,Tim W.,Phil,Tim B.,Zisis,Liping,Jon Z.,Sasha,Josh,Susan,S.T. | ||
+ | *Procurement updates | ||
+ | ** The SICCAS crystals are at the lab but have not been inspected yet | ||
+ | *** Sasha trying to coordinate with management to allow him and Vlad B. onto the JLab site to do this | ||
+ | **Light guide samples have arrived at JLab | ||
+ | **Brass pieces not arrived at JLab yet -- maybe today? | ||
+ | **first 20 mu-metal pieces shipped on Monday | ||
+ | *PAC jeopardy discussion | ||
+ | ** Consensus is that JEF physics is still solid and existing simulations are probably sufficient | ||
+ | *** We might consider extending physics reach to include π0e+e-, φ(scalar)π0 where φ(scalar)→π+π- | ||
+ | **We did think that we should work on exclusion plots for the dark scalar. Igal will work on this. | ||
+ | ** Will be discussing jeopardy in meeting with GlueX folks later on Friday. Some unresolved issues: | ||
+ | *** What kind of documentation will we need to provide? Sasha will work on FCAL II construction table. | ||
+ | *** What is overlap of 2 approved GlueX proposals and what does this mean for JEF running time (expected to be in parallel with GlueX)? Management seems to want to merge the 2 running periods. |
Latest revision as of 14:31, 17 April 2020
Meeting time and location= 9:00 am EST (JLab time) Bluejeans only
Connection instructions
We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: 1 888 240 2560 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Agenda
- Status of the crystal procurement (SICCAS)
- Preparation for module fabrication
- COMCAL tests, TAC running, etc.
- Preparations for PAC meeting (jeopardy)
Minutes
Attendees: Arshak,Igal,Tim W.,Phil,Tim B.,Zisis,Liping,Jon Z.,Sasha,Josh,Susan,S.T.
- Procurement updates
- The SICCAS crystals are at the lab but have not been inspected yet
- Sasha trying to coordinate with management to allow him and Vlad B. onto the JLab site to do this
- Light guide samples have arrived at JLab
- Brass pieces not arrived at JLab yet -- maybe today?
- first 20 mu-metal pieces shipped on Monday
- The SICCAS crystals are at the lab but have not been inspected yet
- PAC jeopardy discussion
- Consensus is that JEF physics is still solid and existing simulations are probably sufficient
- We might consider extending physics reach to include π0e+e-, φ(scalar)π0 where φ(scalar)→π+π-
- We did think that we should work on exclusion plots for the dark scalar. Igal will work on this.
- Will be discussing jeopardy in meeting with GlueX folks later on Friday. Some unresolved issues:
- What kind of documentation will we need to provide? Sasha will work on FCAL II construction table.
- What is overlap of 2 approved GlueX proposals and what does this mean for JEF running time (expected to be in parallel with GlueX)? Management seems to want to merge the 2 running periods.
- Consensus is that JEF physics is still solid and existing simulations are probably sufficient