Difference between revisions of "Photon beam pipe"
From GlueXWiki
Line 1: | Line 1: | ||
+ | Machine interface document draft 1 | ||
+ | |||
+ | [[Media:ICD_Accelerator-HallD_03.doc |hello]] | ||
+ | |||
+ | ---- | ||
+ | |||
Sketch of the photon beamline between the tagger magnet and the West wall of the | Sketch of the photon beamline between the tagger magnet and the West wall of the | ||
tagger hall. | tagger hall. |
Revision as of 10:57, 9 June 2008
Machine interface document draft 1
Sketch of the photon beamline between the tagger magnet and the West wall of the tagger hall. File:Beamline-BSize Layout.TIF
The plans by the accelerator are summarized in their song-sheet. It can be found here
Tagger hall songsheet version March 26 2008