Difference between revisions of "September 22, 2014"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
 
[https://halldweb1.jlab.org/wiki/index.php/Trigger_Commissioning Trigger Commissioning Plan]
 
[https://halldweb1.jlab.org/wiki/index.php/Trigger_Commissioning Trigger Commissioning Plan]
 +
 +
* CTP installation and testing
 +
 +
* Test of the global trigger distribution (using BCAL north crates)
 +
 +
*: Global energy sum
 +
 +
*: BCAL cosmic trigger
 +
 +
* BCAL cosmic trigger for FDC / CDC 
 +
 +
* Trigger calibration status from sub-detectors
 +
 +
*: TAGM/TAGH setups
 +
 +
*: Start Counter
 +
 +
*: Pair Spectrometer
 +
 +
* Trigger monitoring

Revision as of 09:49, 22 September 2014

Trigger Commissioning Plan

  • CTP installation and testing
  • Test of the global trigger distribution (using BCAL north crates)
  • Global energy sum
  • BCAL cosmic trigger
  • BCAL cosmic trigger for FDC / CDC
  • Trigger calibration status from sub-detectors
  • TAGM/TAGH setups
  • Start Counter
  • Pair Spectrometer
  • Trigger monitoring