September 22, 2014

From GlueXWiki
Jump to: navigation, search

Trigger Commissioning Plan

  • CTP installation and testing
  • Test of the global trigger distribution (using BCAL north crates)
  • Global energy sum
  • BCAL cosmic trigger for FDC / CDC
  • Trigger calibration status from sub-detectors
  • TAGM/TAGH setups
  • Start Counter
  • Pair Spectrometer
  • Trigger monitoring