Line 27: Line 27:
 
#* Need signed document?
 
#* Need signed document?
 
#* Accelerator and Hall D Interface Document - needs to be finalized.
 
#* Accelerator and Hall D Interface Document - needs to be finalized.
# Electron Commissioning (Todd/Mike)
+
# Update on Electron Commissioning (Todd/Mike)
# Photon Commissioning Draft (Alexandre)
+
# Update on Photon Commissioning (Alexandre)
# Radiation monitors and controls (Pavel)
+
#* Version for the ARR
 +
# Update Radiation monitors and controls (George/Pavel)
 
# Other business
 
# Other business
  

Revision as of 17:47, 8 August 2014

Organization

  • Time: 4 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Sasha defined geometry, Richard will add field map
    • Sasha needs to update geometry with girder.
    • Richard has not had time to add Dan's new field. For now use the old field.
  • Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D)
    • Need rates for profiler, start counter, ps

Agenda

  1. Announcements
  2. Debrief Aug 8 Review:
  3. Electron Beam Specifications
    • Need signed document?
    • Accelerator and Hall D Interface Document - needs to be finalized.
  4. Update on Electron Commissioning (Todd/Mike)
  5. Update on Photon Commissioning (Alexandre)
    • Version for the ARR
  6. Update Radiation monitors and controls (George/Pavel)
  7. Other business

Minutes

Attending: