Difference between revisions of "GlueX TOF Meeting, September 15, 2011"
From GlueXWiki
Line 12: | Line 12: | ||
#* Detector dimensions, light guide dimensions | #* Detector dimensions, light guide dimensions | ||
#* PMT base design, rates, currents, amplification | #* PMT base design, rates, currents, amplification | ||
− | # | + | #* Attempts to improve timing resolution [http://hadron.physics.fsu.edu/~ostrov/tof/20110915/] |
# Contract Status | # Contract Status | ||
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1713 Schedule] | #* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1713 Schedule] |
Revision as of 09:35, 15 September 2011
Contents
Location, Time
Thursday, September 15, 2011
10:00 am EDT
JLab: CEBAF Center, Room F326
Agenda
- Announcements
- Minutes from the last meeting
- Prototype Status
- Detector dimensions, light guide dimensions
- PMT base design, rates, currents, amplification
- Attempts to improve timing resolution [1]
- Contract Status
Communication
Videoconference
- ESNet: 8542553
- EVO: EVO site
- direct meeting link
- Phone Bridge ID: 10 4388
Telephone
- dial:
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call) or look up toll-free number at http://www.readytalk.com/intl
- enter access code followed by the # sign: 3421244#
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2011-3Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-3Q/ .