Difference between revisions of "Controls To Do List"
From GlueXWiki
m |
m |
||
Line 10: | Line 10: | ||
* When should we use a PC104 vs an IOC on a PC vs direct PLC control? | * When should we use a PC104 vs an IOC on a PC vs direct PLC control? | ||
− | ** Should the FDC gas system use just PLC control and not use a PC104? | + | ** '''Notes''' |
+ | *** Should the FDC gas system use just PLC control and not use a PC104? |
Revision as of 11:59, 3 June 2011
- Should we use ControlNet as well as Ethernet/IP in the hall?
- Notes
- Is there really a network reliability problem?
- Would we have to run a copper line to the counting house?
- Should we use an additional PLC in the hall?
- Should we locate the main PLC in the hall?
- Resolution
- Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself.
- Notes
- When should we use a PC104 vs an IOC on a PC vs direct PLC control?
- Notes
- Should the FDC gas system use just PLC control and not use a PC104?
- Notes