Difference between revisions of "OWG Meeting 16-Feb-2011"
From GlueXWiki
m |
m |
||
Line 49: | Line 49: | ||
'''Coil Test Update''' | '''Coil Test Update''' | ||
+ | |||
+ | * Currently hunting down some vacuum leaks. | ||
+ | * Otherwise everything about ready to go. | ||
+ | * Expect faster cooldown, shorter testing period than with the first coil. | ||
'''Upcoming Tests''' | '''Upcoming Tests''' | ||
+ | |||
+ | * UConn | ||
+ | ** have what they need for microscope test, likely will run in the fall. | ||
+ | ** may need to redesign preamp. | ||
+ | ** Elliott will fine computer for beam monitor test. | ||
+ | |||
+ | |||
+ | * High-speed multi-crate trigger/electronics test in Electronics lab | ||
+ | ** have begun collecting test equipment for use this spring. | ||
+ | ** Dave A will supply multi-core rack-mount computer, Elliott has monitor/keyboard/mouse. | ||
+ | ** firmware still under development, hardware mostly ok. | ||
+ | ** CODA3 eventually will be used, may use codaLite to get started. | ||
+ | ** will use Bryan and Dave's readout libraries in either case. | ||
+ | ** will use Linux rocs. | ||
+ | |||
+ | |||
+ | * FCAL test | ||
+ | ** little known about purpose, timing, schedule, etc. | ||
+ | |||
+ | |||
+ | * FDC test | ||
+ | ** Beni generated list of required hardware and timelines, test starts 6/2012 in EEL 126. | ||
+ | ** will NOT have new F1TDC's available, so must use old F1's. | ||
+ | ** Dave A located 23 old F1's in varying condition, Beni will select 8 good ones for use in the test. | ||
+ | ** need to develop a lot of software by then. | ||
+ | ** Elliott and Beni will generate note on requirements, timelines, milestones, etc. | ||
+ | ** need prototype system by Jan 2012. | ||
Revision as of 15:31, 17 February 2011
Contents
Agenda
- Announcements
-
Review of minutes from 24-Nov-2010 meeting - Coil test update - Elliott
- Getting ready for upcoming tests - all
- Multi-crate trigger test in Electronics lab
- UConn test in Hall B
- FCAL beam test
- FDC cosmic ray test
- IRMIS - Elliott
- detector translation table
- Raw event format - Dave
- Event display - Elliott
- event evio and danaevio input
- Electronics update - Chris
- Trigger update - Alex
- DAQ update - Dave A
- Other electronics, trigger and DAQ status reports - Fernando, Ben, Ed, Dave, William, Bryan
Time/Location
1:30 PM Wed 16-Feb-2011 CC F326
Announcements
Next Meeting
1:30 PM Wed 2-Apr-2011 CC F326
New Action Items from this Meeting
Minutes
Present: Elliott W, Beni Z, Simon T, Dave L, Alex S, Elton S, Yi Q, Bryan M, Hovanes E, Dave A.
Coil Test Update
- Currently hunting down some vacuum leaks.
- Otherwise everything about ready to go.
- Expect faster cooldown, shorter testing period than with the first coil.
Upcoming Tests
- UConn
- have what they need for microscope test, likely will run in the fall.
- may need to redesign preamp.
- Elliott will fine computer for beam monitor test.
- High-speed multi-crate trigger/electronics test in Electronics lab
- have begun collecting test equipment for use this spring.
- Dave A will supply multi-core rack-mount computer, Elliott has monitor/keyboard/mouse.
- firmware still under development, hardware mostly ok.
- CODA3 eventually will be used, may use codaLite to get started.
- will use Bryan and Dave's readout libraries in either case.
- will use Linux rocs.
- FCAL test
- little known about purpose, timing, schedule, etc.
- FDC test
- Beni generated list of required hardware and timelines, test starts 6/2012 in EEL 126.
- will NOT have new F1TDC's available, so must use old F1's.
- Dave A located 23 old F1's in varying condition, Beni will select 8 good ones for use in the test.
- need to develop a lot of software by then.
- Elliott and Beni will generate note on requirements, timelines, milestones, etc.
- need prototype system by Jan 2012.
IRMIS
Raw Event Format
Event Display
ROC Evaluation