* F117 - Elliott, Tom, Scot, Mark S
+
* Training requirements - ODH, ladder, others?
 +
* Printer - Elliott
 +
* F117 - Scot, Elliott, Mark S, Tom
 
** schedule for hole in the wall, door, when will we move out?
 
** schedule for hole in the wall, door, when will we move out?
* Safety review - Elliott
+
* Safety review aftermath - Elliott
 +
** OSP is the next step
 
* Coil test plan - Josh
 
* Coil test plan - Josh
* Magnet power supply commissioning - Cody
+
** Can magnet power be on unattended?
** dump resistor
+
* Magnet power supply and interlock commissioning - Cody
* B field - George
+
** dump resistor, flow switches, interlocks, etc.
** where to place racks?
+
** RS232 connection to power supply
** where to plade computers?
+
** crash buttons - fast or slow dump?
* Controls racks - Scot, Mark S, Cody
+
** polarity and polarity reversal lockout
** relay cards (for open collector outputs)
+
** lock door when magnet ramping down but power supply turned off?
 +
** interlock on strain gauges?
 +
* B field - Elliott
 +
** where to place computers?
 +
* Controls racks - Scot, Elliott
 
** what else is left to do?
 
** what else is left to do?
 +
** Ethernet in racks, new hub
 +
** C-glass sensor locations?
 
* PLC programming/testing status - Mark W
 
* PLC programming/testing status - Mark W
** who else might learn about the Mark's program?  Josh?  Wesley?
+
* UPS status - Mark W, Elliott
* EPICS <--> PLC communications - Wesley
+
** relay modules, use in interlock system
 +
** connection to PLC?
 +
* EPICS <--> PLC communications - Wesley, Elliott
 +
** connection to guard shack
 
* HMI and EWEB programming - Yi, Elliott
 
* HMI and EWEB programming - Yi, Elliott
* Installation status - George
+
* Installation status - George, Mark S
 +
** cryo can delivery
 +
** Two weeks notice to Errol
 +
** backup power in Test Lab
 
* Coil repair status - George
 
* Coil repair status - George
 
* DOE mandated coil replacement plan status - George, Elliott
 
* DOE mandated coil replacement plan status - George, Elliott

Revision as of 15:40, 14 July 2010

Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 15-Jul-2010 9:30am ARC 428


Agenda

  • Training requirements - ODH, ladder, others?
  • Printer - Elliott
  • F117 - Scot, Elliott, Mark S, Tom
    • schedule for hole in the wall, door, when will we move out?
  • Safety review aftermath - Elliott
    • OSP is the next step
  • Coil test plan - Josh
    • Can magnet power be on unattended?
  • Magnet power supply and interlock commissioning - Cody
    • dump resistor, flow switches, interlocks, etc.
    • RS232 connection to power supply
    • crash buttons - fast or slow dump?
    • polarity and polarity reversal lockout
    • lock door when magnet ramping down but power supply turned off?
    • interlock on strain gauges?
  • B field - Elliott
    • where to place computers?
  • Controls racks - Scot, Elliott
    • what else is left to do?
    • Ethernet in racks, new hub
    • C-glass sensor locations?
  • PLC programming/testing status - Mark W
  • UPS status - Mark W, Elliott
    • relay modules, use in interlock system
    • connection to PLC?
  • EPICS <--> PLC communications - Wesley, Elliott
    • connection to guard shack
  • HMI and EWEB programming - Yi, Elliott
  • Installation status - George, Mark S
    • cryo can delivery
    • Two weeks notice to Errol
    • backup power in Test Lab
  • Coil repair status - George
  • DOE mandated coil replacement plan status - George, Elliott