Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 15-Jul-2010 9:30am ARC 428


Agenda

  • Training requirements - ODH, ladder, others?
  • Printer - Elliott
  • F117 - Scot, Elliott, Mark S, Tom
    • schedule for hole in the wall, door, when will we move out?
  • Safety review aftermath - Elliott
    • OSP is the next step
  • Coil test plan - Josh
    • Can magnet power be on unattended?
  • Magnet power supply and interlock commissioning - Cody
    • dump resistor, insulation of dump resistor, flow switches, interlocks, etc.
    • RS232 connection to power supply
    • crash buttons - fast or slow dump?
    • polarity and polarity reversal lockout
    • lock door when magnet ramping down but power supply turned off?
    • interlock on strain gauges?
  • B field - Elliott
    • where to place computers?
  • Controls racks - Scot, Elliott
    • what else is left to do?
    • Ethernet in racks, new hub
    • C-glass sensor locations?
  • PLC programming/testing status - Mark W
  • UPS status - Mark W, Elliott
    • relay modules, use in interlock system
    • connection to PLC?
  • EPICS <--> PLC communications - Wesley, Elliott
    • connection to guard shack
  • HMI and EWEB programming - Yi, Elliott
  • Installation status - George, Mark S
    • cryo can delivery
    • Two weeks notice to Errol
    • backup power in Test Lab
  • Coil repair status - George
  • DOE mandated coil replacement plan status - George, Elliott