Difference between revisions of "Coil Test Weekly Meeting 10-Jun-2010"

From GlueXWiki
Jump to: navigation, search
m
m
Line 11: Line 11:
 
* B field - George, Floyd
 
* B field - George, Floyd
 
** what is field at power supply?
 
** what is field at power supply?
** where to place controls racks?
+
** where to place controls racks (may not need RS485)?
 
+
 
* Safety review - Elliott
 
* Safety review - Elliott
 
** 2-Jul meeting date
 
** 2-Jul meeting date
 
** 23-Jun deadline submit writing assignments to me
 
** 23-Jun deadline submit writing assignments to me
 
** 25-Jun submit documents to committee
 
** 25-Jun submit documents to committee
** everyone must start writing assignments
+
** writing assignments (SME):
** also need coil test plan
+
*** George - pressure (Steve L), large mechanical structures (John K and/or Suresh), B field (Jennifer W)
 +
*** Josh - ODH (Mat), cryo supply (Mat), cryo devices (Mat)
 +
*** Cody - magnet power (Bill Merz)
 +
*** Elliott - controls (Steve L)
 +
** also need coil test plan from George and Josh
 
* Magnet power supply commissioning - Cody
 
* Magnet power supply commissioning - Cody
 
** dump resistor
 
** dump resistor
Line 33: Line 36:
 
** 25 screen limit
 
** 25 screen limit
 
** dual-monitors
 
** dual-monitors
 +
** do we need a printer?
 
* Installation status - George
 
* Installation status - George
 
* Coil repair status - George
 
* Coil repair status - George
 +
* DOE mandated coil replacement plan status - George, Elliott

Revision as of 14:40, 7 June 2010

Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 10-Jun-2010 9:30am ARC 428


Agenda

  • B field - George, Floyd
    • what is field at power supply?
    • where to place controls racks (may not need RS485)?
  • Safety review - Elliott
    • 2-Jul meeting date
    • 23-Jun deadline submit writing assignments to me
    • 25-Jun submit documents to committee
    • writing assignments (SME):
      • George - pressure (Steve L), large mechanical structures (John K and/or Suresh), B field (Jennifer W)
      • Josh - ODH (Mat), cryo supply (Mat), cryo devices (Mat)
      • Cody - magnet power (Bill Merz)
      • Elliott - controls (Steve L)
    • also need coil test plan from George and Josh
  • Magnet power supply commissioning - Cody
    • dump resistor
    • magnetic field
    • upgrade to higher current
  • EPICS <--> PLC communications - Wesley
  • Final A-B equipment order - Elliott
  • Wiring and testing controls racks - Scot
    • how much testing can be done in F117?
    • how much needs the PLC?
  • PLC programming status - Mark W
    • C-glass calibrations - Elliott
  • HMI and EWEB programming - Yi, Elliott
    • 25 screen limit
    • dual-monitors
    • do we need a printer?
  • Installation status - George
  • Coil repair status - George
  • DOE mandated coil replacement plan status - George, Elliott