Difference between revisions of "Jun 10, 2010 Calorimetry"
From GlueXWiki
(→Items for followup from previous meeting(s)) |
|||
Line 25: | Line 25: | ||
# Announcements | # Announcements | ||
+ | # [[FCAL Fabrication Readiness Review]] | ||
# Review of Action Items | # Review of Action Items | ||
# Calibration/Monitoring (Zisis) | # Calibration/Monitoring (Zisis) | ||
# FCAL | # FCAL | ||
## Construction status | ## Construction status | ||
− | |||
## To shashlyk or not to shashlyk. Options (Elton) see Table. Physics Impact, see [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1481 GlueX-doc-1481] | ## To shashlyk or not to shashlyk. Options (Elton) see Table. Physics Impact, see [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1481 GlueX-doc-1481] | ||
## PbWO Insertion. (Ashot) . see [http://www.jlab.org/~gasparan/FCAL_INS/Gasparian_GlueX_Phys_meeting_May_24_2010.ppt] | ## PbWO Insertion. (Ashot) . see [http://www.jlab.org/~gasparan/FCAL_INS/Gasparian_GlueX_Phys_meeting_May_24_2010.ppt] |
Revision as of 13:59, 1 June 2010
Teleconference Time: 11:00 a.m. EDT
- ESNET and EVO session
- Phone in CC F326 is 757-269-6337
- Phone in the Regina Videoconference Suite is 306-585-4204
- Phone only if requested:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone line by request only.
Contents
Items for followup from previous meeting(s)
- Monitoring
- USM: Send drawings of guides to be machined (soon). Send 4 unpolished guides to UofR and 2 unpolished guides to Athens.
- Bcal: Testing to see if LED sources can be viewed by pmts on both sides of the module (UofR/UofA).
- Fcal
- Decision on rad hard detectors
- Ashot to send type of Hamamatsu pmt used for PRIMEX
- Elton and Ashot to meet and resolve any discrepancies between the simulations.
Discussion of Options for Radiation-Hard Insert
Options for Radiation-Hard Insert
Tentative Agenda
- Announcements
- FCAL Fabrication Readiness Review
- Review of Action Items
- Calibration/Monitoring (Zisis)
- FCAL
- Construction status
- To shashlyk or not to shashlyk. Options (Elton) see Table. Physics Impact, see GlueX-doc-1481
- PbWO Insertion. (Ashot) . see [1]
- BCAL
- Calorimeter input to PAC (Zisis)
- Construction Status
- Lead: 6th order of 13cm-wide sheets
- Fibres: Media:FibresAttenLenShips1-12.png
- Npe corrected numbers: Media:ZoomedPage31.png and Media:ZoomedPage38.png
- USM MPPC test stand design update
- Simulations
- Other Updates
Minutes
Attendees: