Line 1: | Line 1: | ||
− | Meeting time and location: | + | [[Media:Example.ogg]]Meeting time and location: |
*9:30 am EST (JLab time) remote only | *9:30 am EST (JLab time) remote only | ||
* [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection information] | * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection information] | ||
Line 13: | Line 13: | ||
* '''Ongoing projects''' | * '''Ongoing projects''' | ||
** - Bundling short cables (groups of 7, 7, and 6 cables): signal (done), HV (done), LV (36 layers done, waiting for cables) [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_26_2024] | ** - Bundling short cables (groups of 7, 7, and 6 cables): signal (done), HV (done), LV (36 layers done, waiting for cables) [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_26_2024] | ||
− | ** - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_26_2024/ | + | ** - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_26_2024/[[Media:May-03-2024.pdf]] Update from Laveen] |
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George / Mindy | * '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George / Mindy | ||
** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx] | ** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx] |
Revision as of 09:11, 3 May 2024
Media:Example.oggMeeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
- Preparation of parts for ECAL -- Sasha
- - signal cables - done
- - signal patch panel [1] - done
- - HV short cables: received, checked, labeled (last week)
- - HV long cable, 18 ready (out of 36)
- - HV distribution boards: in preparation
- - LV cables: waiting for about 160 cables (will need to test, label, and bundle)
- - LV distribution boards [2]. Have to populate with connectors, and design a box around the PCB
- - Chris S. is working on the prototype of the LED board. Currently 5 blue LEDs, consider to add red LEDs as well
- Ongoing projects
- - Bundling short cables (groups of 7, 7, and 6 cables): signal (done), HV (done), LV (36 layers done, waiting for cables) [3]
- - Media:May-03-2024.pdf Update from Laveen
- Testing of PMT dividers -- Sasha / Vlad / George / Mindy
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Installation of the LMS has been completed [6]
- Installation and testing cables and dividers [7][8]
- All crates are connected to the network switch Ethernet switch [9]
- Preparing for testing installed dividers
- Detector installation page
- Preparation for beam tests with the PS
- measure shower beam profile
- shower reconstruction between PbWO4 and LG
- Other hardware projects
- --prototype of the ECAL veto counter
- --study shower profile using PS (also transition region between lead tungstate and LG modules (?) )
- FCAL2 poster for open house?
- JEF/ECAL/FCAL poster
- Analysis/Simulation
- eta to ggpi0's update -- ig