Difference between revisions of "JEF meeting, March 22, 2024"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 20: | Line 20: | ||
** - Adding ECAL (and updating FCAL) translation table in the TT.DB (needed for EPICS scalers) | ** - Adding ECAL (and updating FCAL) translation table in the TT.DB (needed for EPICS scalers) | ||
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen | * '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen | ||
− | ** Preparing safety documents -- Sasha and Vlad | + | ** Preparing safety documents. The following ePASes have been submitted and approved -- Sasha and Vlad |
− | *** | + | *** Installation of the ECAL LMS |
+ | *** Installation of cables and dividers, | ||
+ | *** Beam tests with the PS test setup | ||
+ | *** Preparing ECAL cables (EEL126) | ||
+ | *** Fabrication of calorimeter prototypes (EEL126) | ||
+ | *** Testing ECAL dividers (EEL118) | ||
** Detector installation [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg] | ** Detector installation [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg] | ||
** Installation of the LMS | ** Installation of the LMS |
Revision as of 09:44, 21 March 2024
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables - done
- - signal patch panel [1] - done
- - HV short cables: received, checked, labeled (last week)
- - HV long cable, 18 ready (out of 36)
- - HV distribution boards: in preparation
- - LV cables: 100 cables received, 500 cables in total
- - LV distribution boards [2]. Have to populate with connectors, and design a box around the PCB
- Ongoing projects -- Sasha / Vlad / Hakob / Laveen
- Testing of PMT dividers -- Sasha / Vlad / George
- - Testing procedure [6]
- - About 1420 dividers have been fabricated (Chris, Armen, Mindy)
- - Started removing power regulators on the newly fabricated dividers
- - George has tested 54 dividers (919 have been tested in total) [7].
- - Adding ECAL (and updating FCAL) translation table in the TT.DB (needed for EPICS scalers)
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Preparing safety documents. The following ePASes have been submitted and approved -- Sasha and Vlad
- Installation of the ECAL LMS
- Installation of cables and dividers,
- Beam tests with the PS test setup
- Preparing ECAL cables (EEL126)
- Fabrication of calorimeter prototypes (EEL126)
- Testing ECAL dividers (EEL118)
- Detector installation [8][9][10]
- Installation of the LMS
- Cable and divider installation [13][14][15]
- Power installation on the platform has been completed [16]
- Detector installation page
- Preparing safety documents. The following ePASes have been submitted and approved -- Sasha and Vlad
- Analysis/Simulation