Difference between revisions of "JEF meeting, July 7, 2023"
From GlueXWiki
(Created page with "Meeting time and location: *9:30 am EST (JLab time) remote only * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection inform...") |
|||
Line 14: | Line 14: | ||
*'''Light monitoring system''' -- Arshak | *'''Light monitoring system''' -- Arshak | ||
* '''Simulations/Analysis''' | * '''Simulations/Analysis''' | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Bill, Arshak, Hakob, Sasha, Jane, Phil, Axel, Olga, Zizis, student interns, S.T. | ||
+ | * Grand total fabricated FCAL-2 modules = 1603 + 9 (some crystals recovered from COMCAL have chips) | ||
+ | ** Module testing continues | ||
+ | * Jane inspected 88 SICCAS crystals -- maybe 60-70 are good? | ||
+ | * Fiber stripper for end to be inserted into integrating sphere due in August | ||
+ | * Waiting for rest of fibers for LMS, due in September | ||
+ | * Polishing of existing fibers ~70% dune | ||
+ | * Bundling/labeling cables continues |
Latest revision as of 07:45, 10 July 2023
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL modules -- Sasha
- Module fabrication -- Sasha
- Ongoing projects -- Sasha, all
- Testing of PMT dividers -- Sasha / Vlad
- Procedures
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak / Vlad / Hakob
- Light monitoring system -- Arshak
- Simulations/Analysis
Minutes
Attendees: Bill, Arshak, Hakob, Sasha, Jane, Phil, Axel, Olga, Zizis, student interns, S.T.
- Grand total fabricated FCAL-2 modules = 1603 + 9 (some crystals recovered from COMCAL have chips)
- Module testing continues
- Jane inspected 88 SICCAS crystals -- maybe 60-70 are good?
- Fiber stripper for end to be inserted into integrating sphere due in August
- Waiting for rest of fibers for LMS, due in September
- Polishing of existing fibers ~70% dune
- Bundling/labeling cables continues