Difference between revisions of "JEF meeting, October 7, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 17: | Line 17: | ||
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 715 CRYTUR], available: 47 | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 715 CRYTUR], available: 47 | ||
* Updates from the FCAL installation meetings with Tim's group -- Sasha | * Updates from the FCAL installation meetings with Tim's group -- Sasha | ||
− | ** [https://halldweb.jlab.org/wiki/index.php/ | + | ** [https://halldweb.jlab.org/wiki/index.php/October_05,_2022_FCAL_Insert_Installation_Meeting October 5] |
** [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings Link to the earlier design meetings] | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings Link to the earlier design meetings] | ||
* Preparation of parts for FCAL2 modules -- Sasha | * Preparation of parts for FCAL2 modules -- Sasha | ||
* Light Monitoring System -- Arshak | * Light Monitoring System -- Arshak |
Revision as of 09:21, 7 October 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Received 40 CRYTUR crystals from Physics Division[1]
- Wrapped CRYTUR crystals: 717 (10 since last week)
- Available for wrapping: 762 - 717 = 45
- DSG group continues wrapping
- List of available parts
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1291 (44 modules fabricated since last week)
- All SICCAS 576 SICCAS
- 715 CRYTUR, available: 47
- Updates from the FCAL installation meetings with Tim's group -- Sasha
- Preparation of parts for FCAL2 modules -- Sasha
- Light Monitoring System -- Arshak