JEF meeting, October 7, 2022
From GlueXWiki
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Received 40 CRYTUR crystals from Physics Division[1]
- Wrapped CRYTUR crystals: 717 (10 since last week)
- Available for wrapping: 762 - 717 = 45
- DSG group continues wrapping
- List of available parts
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1291 (44 modules fabricated since last week)
- All SICCAS 576 SICCAS
- 715 CRYTUR, available: 47
- Updates from the FCAL installation meetings with Tim's group -- Sasha
- Preparation of parts for FCAL2 modules -- Sasha
- Light Monitoring System -- Arshak
Minutes
Attendees: Phil, Arshak, Igal, Liping, Sasha, Zisis, Azizah, Jane, Tim B., S.T.
- Phil will give a talk at the upcoming DNP meeting to highlight all the work done by the students during the summer
- Received 40 lead tungstate crystals from physics division, out of 150
- 60 more crystals to come
- Wrapping continues, 45 to go of crystals in house
- Fabricated module grand total = 1291
- 100 more modules to be assembled by the end of the year
- Have enough PMT housings for all available crystals, full set within 1-2 months
- Light guides almost complete
- Brass straps ordered, still waiting
- Installation meetings: Sasha will present plans + manpower estimates
- FCAL frame under construction
- Cabling, patch panels, etc. under discussion
- Have most electronics, need to order crate trigger processors
- LMS: need to check FCAL plexiglas -- will it need to be replaced?