Difference between revisions of "August 10, 2022 FCAL Insert Installation Meeting"
From GlueXWiki
(→Minutes) |
(→Minutes) |
||
Line 17: | Line 17: | ||
** Equipment needed (shelving, tooling etc) | ** Equipment needed (shelving, tooling etc) | ||
** Space needed | ** Space needed | ||
+ | ** include CCAL disassy and refurb modules | ||
+ | ** Include testing of all crystals inside hall | ||
* Discussion on attaching racks to platform - Tim to investigate | * Discussion on attaching racks to platform - Tim to investigate | ||
* Maybe a good idea to do a 10x10 stack up to practice and see where the difficulties lie | * Maybe a good idea to do a 10x10 stack up to practice and see where the difficulties lie | ||
Line 25: | Line 27: | ||
** will signal cables be light weight and thin? | ** will signal cables be light weight and thin? | ||
** Cabling mock up for center section | ** Cabling mock up for center section | ||
+ | * Need to include disa |
Revision as of 07:52, 15 August 2022
Meeting Time and Place
Wednesday August 10,2022 9:30am At Jefferson Lab, Hall D Counting House and on Teams
Agenda
- Discuss Schedule, space, manpower and equipment needs
Minutes
- Presented the attached presentation covering schedule,space, equipment and manpower
- Need to uncable DIRC and reroute gas lines
- Need to come up with a detailed plan for Lead glass unstacking, refurb and restack (Sasha)
- Materials needed
- Manpower required
- Equipment needed (shelving, tooling etc)
- Space needed
- include CCAL disassy and refurb modules
- Include testing of all crystals inside hall
- Discussion on attaching racks to platform - Tim to investigate
- Maybe a good idea to do a 10x10 stack up to practice and see where the difficulties lie
- Develop a very detailed procedure and schedule for the entire project including manpower (Tim/Scot)
- Develop Cable map and labelling (Fernado)
- Determine space where cables can be labelled as well as manpower
- Investigate if additional trays are needed for additional crystal signal cables
- will signal cables be light weight and thin?
- Cabling mock up for center section
- Need to include disa