* Preparation for mass production of FCAL2 modules -- Sasha | * Preparation for mass production of FCAL2 modules -- Sasha | ||
− | * 60 CRYTUR crystals have been received (and accepted) | + | ** 60 CRYTUR crystals have been received (and accepted) |
− | * 131 SICCAS crystals were moved from the NPS lab. 40 of them have been tested | + | ** 131 SICCAS crystals were moved from the NPS lab. 40 of them have been tested |
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 245) | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 245) |
Revision as of 19:05, 7 April 2022
Meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- 60 CRYTUR crystals have been received (and accepted)
- 131 SICCAS crystals were moved from the NPS lab. 40 of them have been tested
- Module fabrication -- Sasha
- Light Monitoring System -- Arshak
- COMCAL tests, TAC running, etc. -- Sasha
- Data analysis
- Simulations