====[https://www.jlab.org/Hall-D/safety-docs/current/COO.pdf COO], ESAD, [[Media: Final_RCD-RSAD-09.01.2021-HD_SRC-CT_KW_PD_LZ_LP_ja_encrypted_(1).pdf | RSAD]] Things to read before shift. ==== | ====[https://www.jlab.org/Hall-D/safety-docs/current/COO.pdf COO], ESAD, [[Media: Final_RCD-RSAD-09.01.2021-HD_SRC-CT_KW_PD_LZ_LP_ja_encrypted_(1).pdf | RSAD]] Things to read before shift. ==== | ||
− | |||
====[[Analysis shift]] ==== | ====[[Analysis shift]] ==== | ||
Revision as of 12:26, 28 September 2021
SRC/CT@GlueX (E12-19-003) 2021 run, November-January
- Run Coordination Meetings (Daily 8:45 am)
- BlueJeans in the Counting Room:348194990
- Training and Safety Documentation
- SRC/CT@GlueX Full Run Plan
General Shift Information
Hall D Shift-Taker's Main Site
On-call List
- Contact run coordinator if any problems during data taking: (757) 383-5542
Shift Schedule
Shift Sign-up
Shift-Taker's Checklist
Beam Time Accounting
Run Spreadsheet 2021
COO, ESAD, RSAD Things to read before shift.
Analysis shift
Important instructions
* Fill out BTA hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry.
NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. At the end of the shift save BTA to the logbook!
* Please close any GUI that is not being used.
Run Plan November XXXX, 2021
- Take production data: XXXX nA beam on the XXXX target, XXXX configuration, XXXX trigger XXXXX.trg. Each run should last about XXX hours.
Every Shift:
- Follow the run plan as outlined by RC
- With any issue contact On-Call Experts or RC
- Keep shift summary up to date in HDLOG. Record all that happens.
- Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. Note: in the "Sift information" tab choose experiment E12-19-003. . At the end of the shift send BTA to the logbook.
- Fill and submit the shift checklist in the logbook
Every Run:
- After "Go":
- Update the Run Spreadsheet
- Check ROOTSpy and compare plots with ....
Remote Shifts
Overview
- Bluejeans for 24-7 communication with counting house: https://bluejeans.com/XXXXX
- Remote VNC connection instructions: Guidelines for Remote Worker Shift
Tasks
- Fill shift checklist
- Upload plots to the Hall D logbook once per run
- ?????
- Monitor beam quality
- EPICS overview screen
- In VNC or [XXXXXX Web Browser]
- Strip charts
- EPICS overview screen
- Monitor data quality
- Communicate with the shift expert about issues with any of the above