Difference between revisions of "CPP and NPP Readiness Review"
From GlueXWiki
(→Issues for the Readiness Review) |
(→Issues for the Readiness Review) |
||
Line 10: | Line 10: | ||
## [https://userweb.jlab.org/~ilarin/cpp/tof_note3/rates.pdf CPP Test and TOF Rates] (Ilya) | ## [https://userweb.jlab.org/~ilarin/cpp/tof_note3/rates.pdf CPP Test and TOF Rates] (Ilya) | ||
# Running CPP and NPP together | # Running CPP and NPP together | ||
+ | |||
+ | == Trigger == | ||
+ | Discussion topics with Sasha | ||
+ | # CPP / NPP plan is to run multiple TOF configuration files + FCAL trigger with possibly a lower threshold. | ||
+ | # Confirm that no new firmware is needed for the TOF, i.e. modifications for TOF only need different configuration files | ||
+ | # We would like to run the TOF trigger with multiple configuration files plus the FCAL trigger | ||
== Documentation for Review == | == Documentation for Review == |
Revision as of 18:10, 19 November 2020
Preparations for the CPP and NPP Readiness Review
- Goal: Complete Readiness Review in time to schedule experiment in 2022
- Media:Coarse Acc Schedule 2021.pdf
Issues for the Readiness Review
- Budget
- Mechanical Design and Installation
- Trigger
- CPP Test and TOF Rates (Ilya)
- Running CPP and NPP together
Trigger
Discussion topics with Sasha
- CPP / NPP plan is to run multiple TOF configuration files + FCAL trigger with possibly a lower threshold.
- Confirm that no new firmware is needed for the TOF, i.e. modifications for TOF only need different configuration files
- We would like to run the TOF trigger with multiple configuration files plus the FCAL trigger