# Last 24 hours: | # Last 24 hours: | ||
#*Production, but RF recovery+NL troubles+vacuum issue resulted in only about 6h of useable beam. | #*Production, but RF recovery+NL troubles+vacuum issue resulted in only about 6h of useable beam. | ||
− | #*Hall accesses by Lubomir and Mark D. ([https://logbooks.jlab.org/entry/3845273 to fix non-working BCal pulser]) during scheduled beam down time. | + | #*Hall accesses by Lubomir (to reset a crate) and Mark D. ([https://logbooks.jlab.org/entry/3845273 to fix non-working BCal pulser]) during scheduled beam down time. |
#*Hall access by Vladimir Berdnikov (PS area) to reinsert crystals and check communication. <!-- Vlad cell cell is 757-277-8135--> | #*Hall access by Vladimir Berdnikov (PS area) to reinsert crystals and check communication. <!-- Vlad cell cell is 757-277-8135--> | ||
# Reports/issues: | # Reports/issues: | ||
Line 26: | Line 26: | ||
#* SRC trigger fine tuning + taking data with SRC trigger. 1 shift (Saturday swing). A. Somov | #* SRC trigger fine tuning + taking data with SRC trigger. 1 shift (Saturday swing). A. Somov | ||
#* Monday Sept. 14th: 10am-16:00: 6h of beam study. | #* Monday Sept. 14th: 10am-16:00: 6h of beam study. | ||
− | #*Tuesday Sept. 15th: All Hand Meeting 9am | + | #*Tuesday Sept. 15th: due to All Hand Meeting at 9am, RC meeting is cancelled (unless something important happens). |
#* Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass. We should request to run on our own slit. | #* Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass. We should request to run on our own slit. | ||
#* Special tasks remaining: | #* Special tasks remaining: |
Revision as of 09:05, 11 September 2020
<- Back to Run Coordination Meetings:Summer2020
MEDCON 5 restrictions (Bob May email)
- adhere to counting room capacity restrictions
- maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK)
- wear masks anytime more than one person present in the counting room
- at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls.
- food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others.
Friday, September 11 at 8:45
- Last 24 hours:
- Production, but RF recovery+NL troubles+vacuum issue resulted in only about 6h of useable beam.
- Hall accesses by Lubomir (to reset a crate) and Mark D. (to fix non-working BCal pulser) during scheduled beam down time.
- Hall access by Vladimir Berdnikov (PS area) to reinsert crystals and check communication.
- Reports/issues:
- Run plan
- One last empty target run (2h) (current diamond radiator config., 350 nA)
- Continue production runs
- SRC trigger fine tuning + taking data with SRC trigger. 1 shift (Saturday swing). A. Somov
- Monday Sept. 14th: 10am-16:00: 6h of beam study.
- Tuesday Sept. 15th: due to All Hand Meeting at 9am, RC meeting is cancelled (unless something important happens).
- Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass. We should request to run on our own slit.
- Special tasks remaining:
- Periodic harp scans (last one done on Sept. 5th). The rates and transmission have been stable
- Beam rastering test
- Check CCal active basis with 2nA beam. 2h. A. Somov. To be scheduled when Hall C is at 1-pass, Hall A is down and we have our own slit.
Thursday, September 10 at 8:45
- Last 24 hours:
- Production, with beam available for most of the day. A lot of beam trips however, which will be taken care of by impromptu RF recovery tomorrow.
- Reports/issues:
- BCal hot channel (Fixed by Sergey)
- New PWO crystals installed
- Waiting for CCAL
- Run plan
- Continue production runs
- Large amount of beam trips due to Hall A beam steering problem. Beam will be down at (tentatively) 9am today for an expected 1 or 2h to address the problem.
- Tuesday Sept. 15th: 3h of beam study expected
- Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass
- Special tasks remaining:
- Beam rastering test
- Periodic harp scans (last one done on Sept. 5th). The rates and transmission have been stable
- Empty target run?