Difference between revisions of "January 15, 2020 CPP Design Meeting"
From GlueXWiki
(Created page with "= Meeting Time and Place == Wednesday January 15, 2020, 2pm At Jefferson Lab, room TED 2504 * Present - == Agenda == * Overall description * Requirements * Concept == Min...") |
(→Minutes and Action Items) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
At Jefferson Lab, room TED 2504 | At Jefferson Lab, room TED 2504 | ||
− | * Present - | + | * Present - Elton Smith, David Lawrence, Rory Miskiman, Stephanie Worthington, Tim Whitlatch. Llya Larin |
== Agenda == | == Agenda == | ||
− | * Overall description | + | * Overall description https://halldweb.jlab.org/DocDB/0041/004180/006/CPP_update_oct19.pdf |
* Requirements | * Requirements | ||
− | * Concept | + | * Concept [[Media:CPP Installation Concept.pdf]] |
− | + | ||
== Minutes and Action Items == | == Minutes and Action Items == | ||
+ | |||
+ | * UMASS has 7 Chambers Built | ||
+ | * Current design uses 6 chambers | ||
+ | * Need 5cm lead US of detector | ||
+ | * Need to determine best orientation of 1st chamber | ||
+ | * Need 60" x 60" active area - need to optimize steel shape | ||
+ | * Since CDC will not be used during this experiment, we can use the Ar/C02 system from that | ||
+ | * Possible installation Fall 2021 | ||
+ | * 8cm x 8cm hole needed in steel. Can have radius in corners | ||
+ | * If the DIRC needs to be moved out for the experiment, the CPP support needs to be able to move with the FCAL platform | ||
+ | * Stephanie will start the 3D modelling and layouts | ||
+ | * Tim will start the structural calculation |
Latest revision as of 08:37, 27 February 2020
Meeting Time and Place =
Wednesday January 15, 2020, 2pm At Jefferson Lab, room TED 2504
- Present - Elton Smith, David Lawrence, Rory Miskiman, Stephanie Worthington, Tim Whitlatch. Llya Larin
Agenda
- Overall description https://halldweb.jlab.org/DocDB/0041/004180/006/CPP_update_oct19.pdf
- Requirements
- Concept Media:CPP Installation Concept.pdf
Minutes and Action Items
- UMASS has 7 Chambers Built
- Current design uses 6 chambers
- Need 5cm lead US of detector
- Need to determine best orientation of 1st chamber
- Need 60" x 60" active area - need to optimize steel shape
- Since CDC will not be used during this experiment, we can use the Ar/C02 system from that
- Possible installation Fall 2021
- 8cm x 8cm hole needed in steel. Can have radius in corners
- If the DIRC needs to be moved out for the experiment, the CPP support needs to be able to move with the FCAL platform
- Stephanie will start the 3D modelling and layouts
- Tim will start the structural calculation