Difference between revisions of "2014-05-28"
From GlueXWiki
(→Reports from Technical Groups) |
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/") |
||
(8 intermediate revisions by 4 users not shown) | |||
Line 18: | Line 18: | ||
== Agenda == | == Agenda == | ||
=== Announcements === | === Announcements === | ||
− | |||
− | === | + | === Ongoing Activities === |
− | * [https:// | + | * [https://halldweb.jlab.org/wiki/index.php/StatusTable TDR Status] |
− | * Solenoid Current | + | * Solenoid Current Studies |
+ | * Hall D Readiness Review. See [https://hdops.jlab.org Documentation for Shifts] | ||
+ | * [[PAC Proposals]] | ||
=== Reports from Technical Groups === | === Reports from Technical Groups === | ||
* Calorimeters: [[May 22, 2014 Calorimetry | May 22, 2014]] | * Calorimeters: [[May 22, 2014 Calorimetry | May 22, 2014]] | ||
+ | ** FCAL | ||
** BCAL | ** BCAL | ||
− | ** | + | ** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-05-06 | May 6, 2014]] |
− | * Tracking [[ | + | * Tracking [[Minutes-5-22-2014|Joint FDC/CDC Meeting May. 22, 2014]] |
** CDC | ** CDC | ||
** FDC | ** FDC |
Latest revision as of 11:29, 31 March 2015
Contents
Meeting Time and Place
The meeting will be on Wednesday May 28, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
Ongoing Activities
- TDR Status
- Solenoid Current Studies
- Hall D Readiness Review. See Documentation for Shifts
- PAC Proposals
Reports from Technical Groups
- Calorimeters: May 22, 2014
- FCAL
- BCAL
- BCAL Reconstruction May 6, 2014
- Tracking Joint FDC/CDC Meeting May. 22, 2014
- CDC
- FDC
- FADC FPGA May 20, 2014
- PID
- TOF May 22, 2014
- Start Counter April 3, 2014
- PID Upgrades May 2, 2014
- Engineering
- Magnets
- Target
- Engineering Activities
- Installation
- Electronics
- Trigger
- Hardware (Level-1) May 21, 2014
- Software (Level-3) May 27, 2014
- DAQ/Monitoring/Controls April 23, 2014
- Offline Software
- Offline April 16, 2014
- Data Challenge Meeting April 11, 2014
- Calibration May 21, 2014
- Photon Beam and Tagger April 28, 2014
- Physics May 19, 2014