Difference between revisions of "2013-06-26"
From GlueXWiki
(→Announcements) |
(→Reports from Technical Groups) |
||
(6 intermediate revisions by one other user not shown) | |||
Line 26: | Line 26: | ||
=== Announcements === | === Announcements === | ||
# Solenoid Status | # Solenoid Status | ||
− | # DNP Meeting at Jefferson Lab in October. Abstract Deadline July 1. | + | # Register for the Software Workshop [[July 2013 Tutorial]] |
+ | # DNP Meeting at Jefferson Lab in October. [http://www.aps.org/meetings/abstract/index.cfm Abstract] Deadline July 1. | ||
+ | # Technical Design Report | ||
+ | # PAC Results | ||
=== MOU and Contract Status === | === MOU and Contract Status === | ||
Line 38: | Line 41: | ||
=== Reports from Technical Groups === | === Reports from Technical Groups === | ||
* Calorimeters | * Calorimeters | ||
− | + | ** Calorimetry [[June 18, 2013 Calorimetry|June 18, 2013]] | |
− | ** Calorimetry [[ | + | ** BCAL Readout [[Jun 25,2013 Readout|June 25, 2013]] |
− | ** BCAL Readout [[ | + | ** BCAL Reconstruction [[BCAL Reconstruction Meeting 2013-06-20| June 20, 2013]] |
− | * Tracking [[ | + | * Tracking [[May 22, 2013 Tracking CDC/FDC| May 22, 2013]] |
** CDC | ** CDC | ||
** FDC | ** FDC | ||
* PID | * PID | ||
− | ** TOF [[GlueX TOF Meeting, | + | ** TOF [[GlueX TOF Meeting, June 20, 2013|June 20, 2013]] |
− | ** Start Counter [[GlueX Start Counter Meeting, | + | ** Start Counter [[GlueX Start Counter Meeting, May 16, 2013#Minutes|May 16, 2013]] |
− | ** PID Upgrades [[ | + | ** PID Upgrades [[May 3, 2013 PID Upgrade|May 3, 2013]] |
* Engineering | * Engineering | ||
** Magnet | ** Magnet | ||
** Target | ** Target | ||
** Engineering Activities | ** Engineering Activities | ||
− | ** Installation [[ | + | ** Installation [[June 21, 2013 Installation|June 21, 2013 Installation]] |
* Electronics | * Electronics | ||
− | + | * Trigger [[OWG Meeting 19-Jun-2013 |June 19, 2013]] | |
− | * Trigger [[OWG Meeting | + | * DAQ/Monitoring/Controls [[OWG Meeting 19-Jun-2013 |June 19, 2013]] |
− | * DAQ/Monitoring/Controls [[OWG Meeting | + | * Offline [[GlueX Offline Meeting, June 12, 2013|June 12, 2013]] |
− | * Offline [[GlueX Offline Meeting, | + | * Photon Beam and Tagger [[BLTWG Meeting 06/24/2013|June 24, 2013]] |
− | * Photon Beam and Tagger [[BLTWG Meeting | + | * Physics [[June 17, 2013, Physics Working Group|June 17, 2013]] |
− | * Physics [[ | + | |
=== Minutes === | === Minutes === |
Latest revision as of 10:43, 26 June 2013
Contents
Meeting Time and Place
The meeting will be on Wednesday June 26, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Polycom RealPresence App on iOS and Android:
Call 8542553@gk1.es.net
3.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
Agenda
Announcements
- Solenoid Status
- Register for the Software Workshop July 2013 Tutorial
- DNP Meeting at Jefferson Lab in October. Abstract Deadline July 1.
- Technical Design Report
- PAC Results
MOU and Contract Status
- MOU Status
- Glasgow
- ASU
- MIT
- Construction Contracts
- FIU
Reports from Technical Groups
- Calorimeters
- Calorimetry June 18, 2013
- BCAL Readout June 25, 2013
- BCAL Reconstruction June 20, 2013
- Tracking May 22, 2013
- CDC
- FDC
- PID
- TOF June 20, 2013
- Start Counter May 16, 2013
- PID Upgrades May 3, 2013
- Engineering
- Magnet
- Target
- Engineering Activities
- Installation June 21, 2013 Installation
- Electronics
- Trigger June 19, 2013
- DAQ/Monitoring/Controls June 19, 2013
- Offline June 12, 2013
- Photon Beam and Tagger June 24, 2013
- Physics June 17, 2013