Difference between revisions of "2012-07-25"

From GlueXWiki
Jump to: navigation, search
(Reports from Technical Groups)
(Announcements)
 
(4 intermediate revisions by 2 users not shown)
Line 28: Line 28:
 
=== Announcements ===
 
=== Announcements ===
 
* JSA Proposals due August 3.
 
* JSA Proposals due August 3.
 +
* [[Private:Scientific Computing Survey, 2012|Scientific Computing Survey]]
 +
* Local JLab PWA meeting on Friday (Carlos Salgado)
  
 
=== MOU and Contract Status ===
 
=== MOU and Contract Status ===
Line 39: Line 41:
 
** UCONN
 
** UCONN
 
** UMass
 
** UMass
 +
=== Calibration and Alignment ===
 +
* Propose a 1-day workshop similar to the upgrade workshop to get people focused.
 +
* GlueX Document for each detector on planned procedures and timelines.
 +
=== Technical Design Report ===
 +
* Propose to have updated material checked into svn by mid August.
  
 
=== Reports from Technical Groups ===
 
=== Reports from Technical Groups ===
Line 45: Line 52:
 
** Calorimetry [[Jul 17, 2012 Calorimetry|July 17, 2012]]
 
** Calorimetry [[Jul 17, 2012 Calorimetry|July 17, 2012]]
 
** BCAL Readout [[Jul 24, 2012 Readout|July 24, 2012]]
 
** BCAL Readout [[Jul 24, 2012 Readout|July 24, 2012]]
** Technical Design Report
 
 
* Tracking [[July 18, 2012 Tracking CDC/FDC | July 18, 2012]]
 
* Tracking [[July 18, 2012 Tracking CDC/FDC | July 18, 2012]]
 
** CDC
 
** CDC
 
** FDC
 
** FDC
** Technical Design Report
 
 
* PID  
 
* PID  
 
** TOF [[GlueX TOF Meeting, July 19, 2012#Minutes|July 19, 2012]]   
 
** TOF [[GlueX TOF Meeting, July 19, 2012#Minutes|July 19, 2012]]   
*** Technical Design Report
 
 
** Start Counter [[GlueX Start Counter Meeting, July 12, 2012#Minutes|July 12, 2012]]
 
** Start Counter [[GlueX Start Counter Meeting, July 12, 2012#Minutes|July 12, 2012]]
*** Technical Design Report
 
 
** PID Upgrades [[July 23, 2012 PID Upgrade|July 23, 2012]]
 
** PID Upgrades [[July 23, 2012 PID Upgrade|July 23, 2012]]
 
* Engineering  
 
* Engineering  
Line 60: Line 63:
 
** Target  
 
** Target  
 
** Engineering Activities
 
** Engineering Activities
** Technical Design Report
 
 
* Electronics
 
* Electronics
** Technical Design Report
 
 
* Trigger [[OWG Meeting 18-Jul-2012 |July 18, 2012]]
 
* Trigger [[OWG Meeting 18-Jul-2012 |July 18, 2012]]
** Technical Design Report
 
 
* DAQ/Monitoring/Controls [[OWG Meeting 18-Jul-2012 |July 18, 2012]]
 
* DAQ/Monitoring/Controls [[OWG Meeting 18-Jul-2012 |July 18, 2012]]
** Technical Design Report
 
 
* Offline  
 
* Offline  
 
** Software Meeting [[GlueX Offline Meeting, July 11, 2012#Minutes|July 11, 2012]]
 
** Software Meeting [[GlueX Offline Meeting, July 11, 2012#Minutes|July 11, 2012]]
 
** Data Challenge [[GlueX Data Challenge Meeting, July 16, 2012|July 16, 2012]]
 
** Data Challenge [[GlueX Data Challenge Meeting, July 16, 2012|July 16, 2012]]
** Technical Design Report
 
 
* Photon Beam and Tagger [[BLTWG Meeting 07/23/2012|July 23, 2012]]
 
* Photon Beam and Tagger [[BLTWG Meeting 07/23/2012|July 23, 2012]]
** Technical Design Report
 
 
* Physics [[July 16, 2012 (11:30AM), Physics Working Group|July 16, 2012]]
 
* Physics [[July 16, 2012 (11:30AM), Physics Working Group|July 16, 2012]]
  
 
=== AOT ===
 
=== AOT ===

Latest revision as of 10:49, 25 July 2012

Meeting Time and Place

The meeting will be on Wednesday July 25, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

To connect from the outside:

1.) ESNET:

   Call ESNET Number 8542553 (this is the preferred connection method).

2.) Phone: (should not be needed)

  +1-866-740-1260 : US and Canada
  +1-303-248-0285 : International
    then use participant code: 3421244# (the # is needed when using the phone)
  or www.readytalk.com
   then type access code 3421244 into "join a meeting" (you need java plugin)

3.) EVO:

   A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
  • To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code, 103736. Instructions for the Phone Bridge to EVO.
  • Skype Bridge to EVO

Agenda

Announcements

MOU and Contract Status

Calibration and Alignment

  • Propose a 1-day workshop similar to the upgrade workshop to get people focused.
  • GlueX Document for each detector on planned procedures and timelines.

Technical Design Report

  • Propose to have updated material checked into svn by mid August.

Reports from Technical Groups

AOT