Difference between revisions of "Coil Test Weekly Meeting 13-May-2011"

From GlueXWiki
Jump to: navigation, search
m
m
 
(2 intermediate revisions by the same user not shown)
Line 10: Line 10:
  
 
* Coil 3 status
 
* Coil 3 status
** we may be ready for powered operations this Mon 16-May
+
** Note:  prepare for powered operations this Mon 16-May!
 
** Danfysik power transistor, fault sequencer and slow dump
 
** Danfysik power transistor, fault sequencer and slow dump
 
** PLC and HMI programming
 
** PLC and HMI programming
 
** real-time graphics for VME-based fast DAQ
 
** real-time graphics for VME-based fast DAQ
* Document trip chains
+
* Documentation
 +
** In Process Inspections (IPI's)
 +
** trip chains
 
* Status of other tests:  VME/VXS crates, HV/LV crates, SiPM's
 
* Status of other tests:  VME/VXS crates, HV/LV crates, SiPM's
 
* [[For_the_third_coil|To-do list]] for the next coil
 
* [[For_the_third_coil|To-do list]] for the next coil
Line 22: Line 24:
 
* [http://irmis.sourceforge.net IRMIS]
 
* [http://irmis.sourceforge.net IRMIS]
 
** giving up on JBoss, switching to GlassFish
 
** giving up on JBoss, switching to GlassFish
 +
** [http://irmisvm.jlab.org:8080/IRMISComponents IRMIS at JLab]
 
* Preparing for moving into the hall
 
* Preparing for moving into the hall

Latest revision as of 08:58, 13 May 2011

Solenoid Coil Test Weekly Meeting

Location and Time

  • Fri 13-May-2011 9:30 am ARC 231


Agenda

  • Coil 3 status
    • Note: prepare for powered operations this Mon 16-May!
    • Danfysik power transistor, fault sequencer and slow dump
    • PLC and HMI programming
    • real-time graphics for VME-based fast DAQ
  • Documentation
    • In Process Inspections (IPI's)
    • trip chains
  • Status of other tests: VME/VXS crates, HV/LV crates, SiPM's
  • To-do list for the next coil
    • measure UPS lifetime under operating conditions
  • Coil 2 repair status
    • short to ground
  • IRMIS
  • Preparing for moving into the hall