Line 12: | Line 12: | ||
** when must we vacate to make room for others? shortly after 16-Jul? | ** when must we vacate to make room for others? shortly after 16-Jul? | ||
** is there enough room now for Fernando et al? | ** is there enough room now for Fernando et al? | ||
− | ** | + | ** note that hole in wall scheduled for 16-Jul |
+ | ** wiring should be done by 15-Jun, wire testing about a week later | ||
+ | ** how long does Mark W need test PLC program? | ||
* B field - George, Floyd | * B field - George, Floyd | ||
** what is field at power supply? | ** what is field at power supply? | ||
Line 36: | Line 38: | ||
** upgrade to higher current | ** upgrade to higher current | ||
* EPICS <--> PLC communications - Wesley | * EPICS <--> PLC communications - Wesley | ||
− | * | + | * Quick report from EPICS collaboration meeting - Wesley |
+ | * Final equipment orders - Elliott | ||
+ | ** A-B components | ||
+ | ** relay cards (for open collector outputs) | ||
+ | ** anything else? | ||
* Wiring and testing controls racks - Scot | * Wiring and testing controls racks - Scot | ||
** how much testing can be done in F117? | ** how much testing can be done in F117? | ||
** how much needs the PLC? | ** how much needs the PLC? | ||
+ | ** how to prepare for next coil to be tested? | ||
+ | ** who will update wiring diagrams? | ||
* PLC programming status - Mark W | * PLC programming status - Mark W | ||
** C-glass calibrations - Elliott | ** C-glass calibrations - Elliott |
Latest revision as of 11:17, 9 June 2010
Solenoid Coil Test Weekly Meeting
Location and Time
- Thu 10-Jun-2010 9:30am ARC 428
Agenda
- F117 status - Tim, Elliott
- when must we vacate to make room for others? shortly after 16-Jul?
- is there enough room now for Fernando et al?
- note that hole in wall scheduled for 16-Jul
- wiring should be done by 15-Jun, wire testing about a week later
- how long does Mark W need test PLC program?
- B field - George, Floyd
- what is field at power supply?
- if too high, move it? field clamp?
- where to place controls racks (may not need RS485)?
- cannot handle high fields
- where to place computers?
- cannot handle high fields
- what is field at power supply?
- Safety review - Elliott
- 2-Jul meeting date
- 23-Jun deadline submit writing assignments to me (Elton thinks I'll need more time)
- 25-Jun submit documents to committee
- writing assignments (SME):
- George - pressure (Steve L), large mechanical structures (John K and/or Suresh), B field (Jennifer W)
- Josh - ODH (Mat), cryo supply (Mat), cryo devices (Mat)
- Cody - magnet power (Bill Merz)
- Elliott - controls (Steve L)
- also need coil test plan from George and Josh, list of previous reviews
- Coil test plan - Josh
- Magnet power supply commissioning - Cody
- dump resistor
- magnetic field
- upgrade to higher current
- EPICS <--> PLC communications - Wesley
- Quick report from EPICS collaboration meeting - Wesley
- Final equipment orders - Elliott
- A-B components
- relay cards (for open collector outputs)
- anything else?
- Wiring and testing controls racks - Scot
- how much testing can be done in F117?
- how much needs the PLC?
- how to prepare for next coil to be tested?
- who will update wiring diagrams?
- PLC programming status - Mark W
- C-glass calibrations - Elliott
- HMI and EWEB programming - Yi, Elliott
- 25 screen limit
- dual-monitors
- do we need a printer?
- do we need laptops?
- Installation status - George
- Coil repair status - George
- DOE mandated coil replacement plan status - George, Elliott