Difference between revisions of "JEF meeting, September 27, 2024"
From GlueXWiki
(3) |
|||
(12 intermediate revisions by 2 users not shown) | |||
Line 3: | Line 3: | ||
* [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection information] | * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection information] | ||
+ | '''Upcoming presentations''' (from the speaker contact person aka Su) | ||
+ | * discuss upcoming DNP (practice) talk | ||
'''Preparation of parts for ECAL''' -- Sasha | '''Preparation of parts for ECAL''' -- Sasha | ||
Line 17: | Line 19: | ||
* Installation of the light distribution board of the ECAL LMS [https://logbooks.jlab.org/entry/4317207] | * Installation of the light distribution board of the ECAL LMS [https://logbooks.jlab.org/entry/4317207] | ||
* Implementing ECAL into the GlueX DAQ [https://logbooks.jlab.org/entry/4316928] | * Implementing ECAL into the GlueX DAQ [https://logbooks.jlab.org/entry/4316928] | ||
− | :: - rocecal3 crate is working now [https://logbooks.jlab.org/entry/4317415] | + | :: - rocecal3 crate is working now [https://logbooks.jlab.org/entry/4317415] (initial DAQ implementation [https://logbooks.jlab.org/entry/4316928]) |
+ | :: - implementing flash ADC scalers [https://logbooks.jlab.org/entry/4317789] | ||
:: - translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done | :: - translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done | ||
* [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | * [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
* [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings] | * [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings] | ||
+ | * Meeting with Drew Weisenberger regarding Vlad'd involvement in commissioning | ||
* Remaining installation tasks | * Remaining installation tasks | ||
:: - Connecting cooling pipes to the ECAL fan (done by tech group) | :: - Connecting cooling pipes to the ECAL fan (done by tech group) | ||
:: - Installing dark room ceiling and insulation inside the room, required for cooling test (next week) | :: - Installing dark room ceiling and insulation inside the room, required for cooling test (next week) | ||
:: - Test cooling system (next week) | :: - Test cooling system (next week) | ||
− | :: - Installing HV distribution boards, start switching the detector ON | + | :: - Installing HV distribution boards, start switching the detector ON (waiting for HV boxes) |
− | + | ||
'''Students''' -- Sasha | '''Students''' -- Sasha | ||
− | * | + | * Visit of Zhikun from Wuhan |
− | + | '''Restoring PS test setup''' [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | |
+ | |||
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All | ''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Xiaolin, Sasha, Olga, Igal, Susan, Laveen, Stjepan, Vlad, Liping, Jane, S.T. | ||
+ | * Waiting for student from Jane's group | ||
+ | * Vote for Xiaolin's group to join GlueX ongoing | ||
+ | * All long HV cables done, one more bundle in hall | ||
+ | * HV boards sent out for quotes | ||
+ | ** Time frame 3 weeks? Then another 4 weeks to install and finish final detector checkout? | ||
+ | * LV panels received and installed | ||
+ | * Some optical fibers for LMS need to be fixed | ||
+ | * Need to install reference PMTs + alpha source for LMS | ||
+ | * Tech crew working on infrastructure (insulation, piping, testing chilling system) | ||
+ | * Sasha fixed problem with ecalroc3 | ||
+ | * Trigger for LMS instrumented in front panel of trigger electronics | ||
+ | * DAQ running: online scalers, digihits | ||
+ | * Sasha working on commissioning plan | ||
+ | * Vlad to continue working part-time on FCAL-2 | ||
+ | * Laveen continuing work on close shower separation |
Latest revision as of 11:18, 30 September 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Upcoming presentations (from the speaker contact person aka Su)
- discuss upcoming DNP (practice) talk
Preparation of parts for ECAL -- Sasha
- - 5 (12 x 4) and 5 (6 x 8) boards have been received. Received all PCB boards. Soldering wires to connectors
- - Sent out request of quotes for HV boards
- - Two panels for the LV distribution boards received, need to re-connect cables (Sasha, Laveen, Vlad) [3]
Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Installation and testing dividers has been completed [4]
- - need to arrange cables on chains - done
- - need to arrange cables on cable trays - done [5]
- - preparing spare cables (7 short HV, 8 signal and LV) -done
- Installation of the light distribution board of the ECAL LMS [6]
- Implementing ECAL into the GlueX DAQ [7]
- Detector installation page
- Safety briefings
- Meeting with Drew Weisenberger regarding Vlad'd involvement in commissioning
- Remaining installation tasks
- - Connecting cooling pipes to the ECAL fan (done by tech group)
- - Installing dark room ceiling and insulation inside the room, required for cooling test (next week)
- - Test cooling system (next week)
- - Installing HV distribution boards, start switching the detector ON (waiting for HV boxes)
Students -- Sasha
- Visit of Zhikun from Wuhan
Restoring PS test setup [11]
ECAL commissioning -- Sasha, All
Minutes
Attendees: Xiaolin, Sasha, Olga, Igal, Susan, Laveen, Stjepan, Vlad, Liping, Jane, S.T.
- Waiting for student from Jane's group
- Vote for Xiaolin's group to join GlueX ongoing
- All long HV cables done, one more bundle in hall
- HV boards sent out for quotes
- Time frame 3 weeks? Then another 4 weeks to install and finish final detector checkout?
- LV panels received and installed
- Some optical fibers for LMS need to be fixed
- Need to install reference PMTs + alpha source for LMS
- Tech crew working on infrastructure (insulation, piping, testing chilling system)
- Sasha fixed problem with ecalroc3
- Trigger for LMS instrumented in front panel of trigger electronics
- DAQ running: online scalers, digihits
- Sasha working on commissioning plan
- Vlad to continue working part-time on FCAL-2
- Laveen continuing work on close shower separation