Difference between revisions of "JEF meeting, August 23, 2024"

From GlueXWiki
Jump to: navigation, search
(Created page with "Meeting time and location: *9:30 am EST (JLab time) remote only * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection inform...")
 
(Agenda)
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
  
 
*'''Preparation of parts for ECAL''' -- Sasha  
 
*'''Preparation of parts for ECAL''' -- Sasha  
 +
** - HV long cable: Sammy and Mindy have to assemble 10 cables
 +
** - HV distribution boards  [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board2.jpg]
 +
** - Fix front panel of two LV distribution boards, re-install the boards on the detector frame [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/lv_board1.jpg]
 +
** - LED: Started testing the prototype of the LMS (need to make the detector room light tight)
 +
<!-- **  - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/05_10_2024/May-10-2024-L.pdf Update from Laveen] -->
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen  
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen  
 +
** Report from students [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/06_28_2024/student_report_06_28_2024.pptx]
 +
** Installation of HV cables [https://logbooks.jlab.org/entry/4313492][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_02_2024]
 +
::: - two remaining bundle of cables will be ready in about a week
 +
** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/4315279]
 +
** Installation of long signal cables [https://logbooks.jlab.org/entry/4312667]
 +
** Installation LV patch panels and cables [https://logbooks.jlab.org/entry/4312759]
 +
** Installation of optical fibers [https://logbooks.jlab.org/entry/4311499]
 +
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 +
** [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings]
 
* '''Students''' -- Sasha
 
* '''Students''' -- Sasha
 +
** - Expect one student from Wuhan, waiting for the US visa
 
* '''Beam tests with the PS'''
 
* '''Beam tests with the PS'''
 +
***  measure shower beam profile and reconstruction in the crystal/LG transition region
 +
***  (install prototype with 5x5 PbWO4 modules  + ? LG)
 
* '''Other hardware projects'''
 
* '''Other hardware projects'''
 +
** prototype of the ECAL veto counter (?)
 
*'''Analysis/Simulation'''
 
*'''Analysis/Simulation'''

Latest revision as of 09:20, 23 August 2024

Meeting time and location:

Agenda

  • Preparation of parts for ECAL -- Sasha
    • - HV long cable: Sammy and Mindy have to assemble 10 cables
    • - HV distribution boards [1][2]
    • - Fix front panel of two LV distribution boards, re-install the boards on the detector frame [3]
    • - LED: Started testing the prototype of the LMS (need to make the detector room light tight)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
    • Report from students [4]
    • Installation of HV cables [5][6]
- two remaining bundle of cables will be ready in about a week
  • Students -- Sasha
    • - Expect one student from Wuhan, waiting for the US visa
  • Beam tests with the PS
      • measure shower beam profile and reconstruction in the crystal/LG transition region
      • (install prototype with 5x5 PbWO4 modules + ? LG)
  • Other hardware projects
    • prototype of the ECAL veto counter (?)
  • Analysis/Simulation