Difference between revisions of "JEF meeting, July 26, 2024"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
(2 intermediate revisions by the same user not shown)
Line 11: Line 11:
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen  
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen  
 
** Report from students [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/06_28_2024/student_report_06_28_2024.pptx]
 
** Report from students [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/06_28_2024/student_report_06_28_2024.pptx]
** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/4310168][https://logbooks.jlab.org/entry/4312779]
+
** Installation of HV cables [https://logbooks.jlab.org/entry/4313492]
 +
** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/4313507]
 
** Installation of long signal cables [https://logbooks.jlab.org/entry/4312667]
 
** Installation of long signal cables [https://logbooks.jlab.org/entry/4312667]
** Installing LV patch panels and cables [https://logbooks.jlab.org/entry/4312759]
+
** Installation LV patch panels and cables [https://logbooks.jlab.org/entry/4312759]
 
** Installation of optical fibers [https://logbooks.jlab.org/entry/4311499]
 
** Installation of optical fibers [https://logbooks.jlab.org/entry/4311499]
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 
** [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings]
 
** [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings]
* '''Summer students''' -- Sasha
+
* '''Students''' -- Sasha
** - Olivia, Ben, and Shane are on site. Expect one student from Wuhan (have to start with the paperwork)
+
** - Expect one student from Wuhan, paperwork is in process.
** - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots
+
 
* '''Beam tests with the PS'''
 
* '''Beam tests with the PS'''
 
***  measure shower beam profile and reconstruction in the crystal/LG transition region  
 
***  measure shower beam profile and reconstruction in the crystal/LG transition region  

Latest revision as of 09:23, 26 July 2024

Meeting time and location:

Agenda

  • Preparation of parts for ECAL -- Sasha
    • - HV long cable: Sammy and Mindy have to assemble 10 cables
    • - HV distribution boards. Chris has completed the design of the HV distribution boards. We met with Chris, Tim, and Scot regarding location of the boards on the detector frame
    • - LED: Started testing the prototype of the LMS (need to make the detector room light tight)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
  • Students -- Sasha
    • - Expect one student from Wuhan, paperwork is in process.
  • Beam tests with the PS
      • measure shower beam profile and reconstruction in the crystal/LG transition region
      • (install prototype with 5x5 PbWO4 modules + ? LG)
  • Other hardware projects
    • prototype of the ECAL veto counter (?)
  • Analysis/Simulation