Difference between revisions of "JEF meeting, June 14, 2024"
From GlueXWiki
(Created page with "Meeting time and location: *9:30 am EST (JLab time) remote only * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection inform...") |
|||
(6 intermediate revisions by one other user not shown) | |||
Line 5: | Line 5: | ||
=Agenda= | =Agenda= | ||
*'''Preparation of parts for ECAL''' -- Sasha | *'''Preparation of parts for ECAL''' -- Sasha | ||
+ | ** - HV long cable, 18 ready (out of 36), discussion with the DSG group regarding help | ||
+ | ** - HV distribution boards: has not yet been designed, need 4 boards | ||
+ | ** - LV cables: missing about 20 cables, waiting for the last delivery batch. | ||
+ | ** - LV distribution boards [https://halldweb.jlab.org/detectors/fcal2/cables/lv_distribution/lv_dist_board.jpg ]. One board out of 4 is ready, using for testing dividers [[Media:lv_distribution.jpg]] | ||
+ | ** - LED: prototype board is ready, have to start testing | ||
* '''Ongoing projects''' - All | * '''Ongoing projects''' - All | ||
+ | <!-- ** - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/05_10_2024/May-10-2024-L.pdf Update from Laveen] --> | ||
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George / Mindy | * '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George / Mindy | ||
+ | ** - [[File:regulators.xlsx]] Map of dividers with removed regulators | ||
+ | ** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx] | ||
+ | ** - All dividers have been fabricated and tested by George [https://halldweb.jlab.org/wiki/index.php/Final_test_of_dividers] | ||
+ | *** Continue removing regulators from the PCB (about 70 regulators have been removed, require re-testing dividers) | ||
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen | * '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen | ||
+ | ** Report from students [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/06_14_2024/students_report_06_14_2024.pptx] | ||
+ | ** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/4310168] | ||
+ | ** Installation of signal patch panels [https://logbooks.jlab.org/entry/4310714] | ||
+ | ** Installation of long signal cables [https://halldweb.jlab.org/wiki/images/6/62/Fcal2_vxs_crates_new.png][https://logbooks.jlab.org/entry/4310717] | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
* '''Summer students''' -- Sasha | * '''Summer students''' -- Sasha | ||
+ | ** - Olivia, Ben, and Shane are on site. Expect one student from Wuhan (have to start with the paperwork) | ||
+ | ** - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots | ||
* '''Beam tests with the PS''' | * '''Beam tests with the PS''' | ||
+ | *** measure shower beam profile and reconstruction in the crystal/LG transition region | ||
+ | *** (install prototype with 5x5 PbWO4 modules + ? LG) | ||
* '''Other hardware projects''' | * '''Other hardware projects''' | ||
+ | ** prototype of the ECAL veto counter (?) | ||
+ | *'''FCAL2 posters for open house'''** [[File:1-OH24-Poster-H-Laveen-revised4.pdf]] | ||
*'''Analysis/Simulation''' | *'''Analysis/Simulation''' | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Bill, Vlad, Laveen, Sasha, Olivia, Ben, Shane, Liping, Jane, S.T. | ||
+ | * Connecting cables to 4 out 7 FADC crates has been completed | ||
+ | * 2 signal patch panels have been installed, putting in bulkhead connectors | ||
+ | * Bottom half of insert cabling complete, will start on top half | ||
+ | ** More dividers to be installed soon | ||
+ | ** Waiting for vertical cable trays |
Latest revision as of 07:49, 17 June 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - HV long cable, 18 ready (out of 36), discussion with the DSG group regarding help
- - HV distribution boards: has not yet been designed, need 4 boards
- - LV cables: missing about 20 cables, waiting for the last delivery batch.
- - LV distribution boards [1]. One board out of 4 is ready, using for testing dividers Media:lv_distribution.jpg
- - LED: prototype board is ready, have to start testing
- Ongoing projects - All
- Testing of PMT dividers -- Sasha / Vlad / George / Mindy
- - File:Regulators.xlsx Map of dividers with removed regulators
- - Testing procedure [2]
- - All dividers have been fabricated and tested by George [3]
- Continue removing regulators from the PCB (about 70 regulators have been removed, require re-testing dividers)
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Summer students -- Sasha
- - Olivia, Ben, and Shane are on site. Expect one student from Wuhan (have to start with the paperwork)
- - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots
- Beam tests with the PS
- measure shower beam profile and reconstruction in the crystal/LG transition region
- (install prototype with 5x5 PbWO4 modules + ? LG)
- Other hardware projects
- prototype of the ECAL veto counter (?)
- FCAL2 posters for open house** File:1-OH24-Poster-H-Laveen-revised4.pdf
- Analysis/Simulation
Minutes
Attendees: Bill, Vlad, Laveen, Sasha, Olivia, Ben, Shane, Liping, Jane, S.T.
- Connecting cables to 4 out 7 FADC crates has been completed
- 2 signal patch panels have been installed, putting in bulkhead connectors
- Bottom half of insert cabling complete, will start on top half
- More dividers to be installed soon
- Waiting for vertical cable trays