Difference between revisions of "Testing of PMT dividers"
From GlueXWiki
(6 intermediate revisions by the same user not shown) | |||
Line 6: | Line 6: | ||
</gallery> | </gallery> | ||
+ | '''[[Final test of dividers]]''' | ||
Line 42: | Line 43: | ||
Image:ccal_prot_cables4.jpg | Fig. 4 - Patch panels: LV distribution for the 5x5 prototype (right) | Image:ccal_prot_cables4.jpg | Fig. 4 - Patch panels: LV distribution for the 5x5 prototype (right) | ||
Image:ccal_prot_cables5.jpg | Fig. 5 - Patch panel from the outside of the CCAL (the MPOD connector is on the left) | Image:ccal_prot_cables5.jpg | Fig. 5 - Patch panel from the outside of the CCAL (the MPOD connector is on the left) | ||
+ | </gallery> | ||
+ | |||
+ | |||
+ | '''Tuning dividers after the CCAL beam test ''' | ||
+ | <gallery> | ||
+ | Image:before_saturation_fern.png | Fig. 1 Original base before saturation | ||
+ | Image:after_saturation_fern.png | Fig. 2 Original base, A = 1.8 V | ||
+ | Image:new_ops.png | Fig. 3 Modified OPS | ||
</gallery> | </gallery> |
Latest revision as of 09:43, 19 October 2023
New version of the active base
Bench tests
Installing 5x5 prototype on CCAL
Cables, and patch panels
Tuning dividers after the CCAL beam test