*** Expect to receive 95 more CRYTUR crystals in May (835 + 95 = 930 in total) | *** Expect to receive 95 more CRYTUR crystals in May (835 + 95 = 930 in total) | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 835 (ALL available CRYTUR) ] | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 835 (ALL available CRYTUR) ] | ||
− | *** Available for wrapping: 48 SICCAS crystals from CCAL [https://halldweb.jlab.org/wiki/index.php/All_modules_(with_SICCAS_crystals)_are_removed] | + | *** Available for wrapping: 48 SICCAS crystals from CCAL [https://halldweb.jlab.org/wiki/index.php/All_modules_(with_SICCAS_crystals)_are_removed] [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/ccal_crystals.pdf] |
*** Mindy (DSG group) continues wrapping crystals and soldering wires to sockets | *** Mindy (DSG group) continues wrapping crystals and soldering wires to sockets | ||
** Disassembling CCAL | ** Disassembling CCAL | ||
Line 26: | Line 26: | ||
* '''Installation of the FCAL2 detector''' -- Sasha / Arshak | * '''Installation of the FCAL2 detector''' -- Sasha / Arshak | ||
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
− | ** Updates from the meetings with Tim's group | + | ** Updates from the meetings with Tim's group |
** Manpower and division of tasks | ** Manpower and division of tasks | ||
** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Projects for summer students] | ** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Projects for summer students] | ||
** Meeting with the detector imaging group | ** Meeting with the detector imaging group | ||
* '''Light Monitoring System''' -- Arshak | * '''Light Monitoring System''' -- Arshak | ||
+ | ** [https://userweb.jlab.org/~aasatury/Fcal_LMS/250mkm/ 250mkm fiber light intensity] | ||
* '''Simulations/Analysis''' | * '''Simulations/Analysis''' | ||
* '''Talk on JEF at GHP conference''' | * '''Talk on JEF at GHP conference''' | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Axel, Bill, Sasha, Arshak, Olga, Liping, Susan, Igal, S.T. | ||
+ | * We agreed that Bill would give a talk on JEF at the GHP meeting. A draft of an abstract has been circulated. | ||
+ | * Only 1 Crytur crystal remains to be fabricated into an FCAL-2 module | ||
+ | * 48 crystals have been removed from the COMCAL and stripped of wrapping | ||
+ | ** Most of the caps for fiber insertion have been removed | ||
+ | ** These crystals are to be converted into FCAL-2 modules | ||
+ | * Inner part of the COMCAL will not be used for FCAL-2 due to likely radiation damage | ||
+ | * Grand total FCAL2-modules = 1410 | ||
+ | * Mindy from the detector support group will continue wrapping and soldering wires into sockets | ||
+ | * Will install a 5x5 prototype of FCAL2 modules into COMCAL instrumented with new PMT dividers w/ active base | ||
+ | ** Chris S. has built 25 new dividers | ||
+ | ** Plan to install in hall for beam tests to perform rate measurements, use as TAC, study linearity | ||
+ | * Summer students: ~6 have registered, expect a student from Colin Gleason | ||
+ | * Hoping to get ~25% time from Vlad B. during summer | ||
+ | * RTV for making cookies has arrrived; Bill will take to Olga | ||
+ | * Arshak has been checking light uniformity of 250 micron diameter fibers (alternate approach for LMS, to be compared to plexiglas plate approach) | ||
+ | ** Attached bundle to integrating sphere, look at individual fiber light output | ||
+ | ** First results do not look very uniform: ~30% variation, with one outlier even worse (see [https://userweb.jlab.org/~aasatury/Fcal_LMS/250mkm/250mkm_fiber.jpg]) | ||
+ | *** Suspect due to polishing of fiber end -- could be improved with different procedure? | ||
+ | *** Consider using 500 micron diameter fibers instead? 1 mm fibers demonstrated to work, but are more difficult to bend and contribute more material in front of insert | ||
+ | ** Will probably need to have a bundle of fibers with enough spares, pick and choose to get the desired uniformity |
Latest revision as of 15:54, 20 January 2023
eeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation of parts for FCAL2 modules -- Sasha
- Received all 150 CRYTUR crystals from physics division (22-C0275) [1]
- Expect to receive 95 more CRYTUR crystals in May (835 + 95 = 930 in total)
- Wrapped CRYTUR crystals: 835 (ALL available CRYTUR)
- Disassembling CCAL
- CCAL moved to the ESB
- All modules (with SICCAS crystals) are removed
- List of available parts
- Received all 150 CRYTUR crystals from physics division (22-C0275) [1]
- Module fabrication -- Sasha
- Fabricated modules: Total 1410 (2 modules fabricated since last week)
- Testing of PMT dividers -- Sasha / Arshak
- All parts for dividers have been ordered
- Install 25 modules with new dividers on the CCAL, build prototype of LV patch pannel (check rate and noise)
- Installation of the FCAL2 detector -- Sasha / Arshak
- Detector installation page
- Updates from the meetings with Tim's group
- Manpower and division of tasks
- Projects for summer students
- Meeting with the detector imaging group
- Light Monitoring System -- Arshak
- Simulations/Analysis
- Talk on JEF at GHP conference
Minutes
Attendees: Axel, Bill, Sasha, Arshak, Olga, Liping, Susan, Igal, S.T.
- We agreed that Bill would give a talk on JEF at the GHP meeting. A draft of an abstract has been circulated.
- Only 1 Crytur crystal remains to be fabricated into an FCAL-2 module
- 48 crystals have been removed from the COMCAL and stripped of wrapping
- Most of the caps for fiber insertion have been removed
- These crystals are to be converted into FCAL-2 modules
- Inner part of the COMCAL will not be used for FCAL-2 due to likely radiation damage
- Grand total FCAL2-modules = 1410
- Mindy from the detector support group will continue wrapping and soldering wires into sockets
- Will install a 5x5 prototype of FCAL2 modules into COMCAL instrumented with new PMT dividers w/ active base
- Chris S. has built 25 new dividers
- Plan to install in hall for beam tests to perform rate measurements, use as TAC, study linearity
- Summer students: ~6 have registered, expect a student from Colin Gleason
- Hoping to get ~25% time from Vlad B. during summer
- RTV for making cookies has arrrived; Bill will take to Olga
- Arshak has been checking light uniformity of 250 micron diameter fibers (alternate approach for LMS, to be compared to plexiglas plate approach)
- Attached bundle to integrating sphere, look at individual fiber light output
- First results do not look very uniform: ~30% variation, with one outlier even worse (see [4])
- Suspect due to polishing of fiber end -- could be improved with different procedure?
- Consider using 500 micron diameter fibers instead? 1 mm fibers demonstrated to work, but are more difficult to bend and contribute more material in front of insert
- Will probably need to have a bundle of fibers with enough spares, pick and choose to get the desired uniformity