Difference between revisions of "November 18, 2008 Software"
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private") |
|||
(5 intermediate revisions by one other user not shown) | |||
Line 5: | Line 5: | ||
#* JLab wireless network | #* JLab wireless network | ||
#: | #: | ||
− | # Start Counter MC Studies (Seema D.) | + | # [[Media:20081118_start_counter.pdf|Start Counter MC Studies]] (Seema D.) |
− | # Report on ACAT08 Workshop (David L.) | + | # [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1171 Report on ACAT08 Workshop] (David L.) |
# [[Action Items From Hall-D Software Meetings|Action Items]] | # [[Action Items From Hall-D Software Meetings|Action Items]] | ||
==Participating== | ==Participating== | ||
===Location=== | ===Location=== | ||
− | The meeting will be at | + | The meeting will be at 12:00pm in Cebaf Center F326. |
===Telephone=== | ===Telephone=== | ||
Line 30: | Line 30: | ||
==Minutes== | ==Minutes== | ||
− | Attendees: | + | Attendees: David L. (chair), Elke A., Simon T., Alex S., Beni Z., Elliott W., Mark I., Jim S. |
+ | |||
+ | Phone: Seema D., Blake L. | ||
+ | |||
+ | ===Start Counter=== | ||
+ | |||
+ | Seema gave a brief update on the current simulation studies being done for the start counter (S.C.) Highlights from the discussion are: | ||
+ | |||
+ | * 25 staves currently in svn. Should be 40. | ||
+ | * ~ 2.8 MHz in all S.C. for 10^8 gamma/sec | ||
+ | * Seema will make geometry changes in repository | ||
+ | * There was a question about BEAM objects in the data stream and for what generators they are available. This will be checked on | ||
+ | * It was suggested that the Seema look into the ability of the S.C. to identify protons | ||
+ | |||
+ | ===ACAT Workshop report=== | ||
+ | |||
+ | David reported on the ACAT workshop in Erice, Sicily Dec. 3-7. There, he reported on the multi-threaded event processing capability of JANA. There were numerous talks/discussions on moving to a parallel programming techniques including multi-threading and SIMD (single instruction, multiple data) functions. The main points were: | ||
+ | |||
+ | * Vectorization of code via SIMD | ||
+ | * Parallelism in general | ||
+ | * Virtualization | ||
+ | * Multivariate Analysis | ||
+ | * the LLVM compiler system | ||
+ | * Java in HEAP (High Energy and Astrophysics) | ||
+ | * Cell broadband Engine | ||
+ | |||
==[[Action Items From Hall-D Software Meetings|Action items]]== | ==[[Action Items From Hall-D Software Meetings|Action items]]== | ||
− | '' | + | |
+ | ''No action items were discussed'' | ||
==Next Meeting== | ==Next Meeting== | ||
− | + | [[ December 3, 2008 Software]] |
Latest revision as of 17:13, 24 February 2017
Contents
Agenda
- Review minutes from October 8, 2008 Software meeting
- Announcements
- JLab wireless network
- Start Counter MC Studies (Seema D.)
- Report on ACAT08 Workshop (David L.)
- Action Items
Participating
Location
The meeting will be at 12:00pm in Cebaf Center F326.
Telephone
To connect by telephone: 1.) dial:
800-377-8846 : US 888-276-7715 : Canada 302-709-8424 : International
2.) enter participant code: 39527048# (remember the "#")
Video Conferencing
We will attempt an EVO connection for this meeting. We have a reasonable expectation that this will work.
Minutes
Attendees: David L. (chair), Elke A., Simon T., Alex S., Beni Z., Elliott W., Mark I., Jim S.
Phone: Seema D., Blake L.
Start Counter
Seema gave a brief update on the current simulation studies being done for the start counter (S.C.) Highlights from the discussion are:
- 25 staves currently in svn. Should be 40.
- ~ 2.8 MHz in all S.C. for 10^8 gamma/sec
- Seema will make geometry changes in repository
- There was a question about BEAM objects in the data stream and for what generators they are available. This will be checked on
- It was suggested that the Seema look into the ability of the S.C. to identify protons
ACAT Workshop report
David reported on the ACAT workshop in Erice, Sicily Dec. 3-7. There, he reported on the multi-threaded event processing capability of JANA. There were numerous talks/discussions on moving to a parallel programming techniques including multi-threading and SIMD (single instruction, multiple data) functions. The main points were:
- Vectorization of code via SIMD
- Parallelism in general
- Virtualization
- Multivariate Analysis
- the LLVM compiler system
- Java in HEAP (High Energy and Astrophysics)
- Cell broadband Engine
Action items
No action items were discussed