Difference between revisions of "September 22, 2014"

From GlueXWiki
Jump to: navigation, search
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")
 
(2 intermediate revisions by one other user not shown)
Line 1: Line 1:
[https://halldweb1.jlab.org/wiki/index.php/Trigger_Commissioning Trigger Commissioning Plan]
+
[https://halldweb.jlab.org/wiki/index.php/Trigger_Commissioning Trigger Commissioning Plan]
 
+
  
 
* CTP installation and testing
 
* CTP installation and testing
Line 8: Line 7:
 
:* Global energy sum
 
:* Global energy sum
  
:* [[Media::C3_cosm_examp.png | BCAL cosmic trigger]]
+
:* [[Media:C3_cosm_examp.png | BCAL cosmic trigger]]
  
 
* BCAL cosmic trigger for FDC / CDC   
 
* BCAL cosmic trigger for FDC / CDC   

Latest revision as of 06:51, 1 April 2015

Trigger Commissioning Plan

  • CTP installation and testing
  • Test of the global trigger distribution (using BCAL north crates)
  • Global energy sum
  • BCAL cosmic trigger for FDC / CDC
  • Trigger calibration status from sub-detectors
  • TAGM/TAGH setups
  • Start Counter
  • Pair Spectrometer
  • Trigger monitoring