Difference between revisions of "Controls Meeting 23-Jan-2014"
From GlueXWiki
(Created page with "=Agenda= * Announcements * Minutes from previous meeting Controls Meeting 9-Jan-2014 * UPS requirements for Hall D *: Total maximum power consumed by PLC, location in the ha...") |
|||
Line 4: | Line 4: | ||
* Minutes from previous meeting [[Controls Meeting 9-Jan-2014]] | * Minutes from previous meeting [[Controls Meeting 9-Jan-2014]] | ||
* UPS requirements for Hall D | * UPS requirements for Hall D | ||
− | *: Total maximum power consumed by PLC, location in the hall (Dave) | + | *: [[media:PLClayoutInHallD.xlsx | Total maximum power consumed by PLC, location in the hall]] (Dave) |
*: Total maximum power consumed by solenoid controls, location in the hall (Yi) | *: Total maximum power consumed by solenoid controls, location in the hall (Yi) | ||
*: Total maximum power consumed by motor controls, location in the hall (Hovanes) | *: Total maximum power consumed by motor controls, location in the hall (Hovanes) |
Revision as of 10:25, 23 January 2014
Agenda
- Announcements
- Minutes from previous meeting Controls Meeting 9-Jan-2014
- UPS requirements for Hall D
- Total maximum power consumed by PLC, location in the hall (Dave)
- Total maximum power consumed by solenoid controls, location in the hall (Yi)
- Total maximum power consumed by motor controls, location in the hall (Hovanes)
- Expected power usage and required time duration during power failure for PLC device (Dave)
- Expected power usage and required time duration during power failure for solenoid controls (Yi)
- Expected power usage and required time duration during power failure for motor controls (Hovanes)
Time/Location
9:30AM Thurs 23-Jan-2014 CC A110