Difference between revisions of "Dec 6, 2011 Calorimetry"
From GlueXWiki
(→Items for followup from previous meeting(s)) |
|||
Line 15: | Line 15: | ||
# Monitoring | # Monitoring | ||
#* Send additional SiPMs to Athens for tests (Elton) | #* Send additional SiPMs to Athens for tests (Elton) | ||
− | #* Measure stability of light intensity as a function of time. | + | #* <strike> Measure stability of light intensity as a function of time. </strike> Measurement in progress, will report at a later meeting. |
#* Jlab to generate a drawing of the plexiglass sheet to be used in next batch of tests. | #* Jlab to generate a drawing of the plexiglass sheet to be used in next batch of tests. | ||
#* <strike> Specify/clarify requirement for monitoring light uniformity into the Pb glass (Matt) </strike> | #* <strike> Specify/clarify requirement for monitoring light uniformity into the Pb glass (Matt) </strike> |
Revision as of 18:56, 6 December 2011
Teleconference Time: 11:00 a.m. EST'
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337; JLab Phone in CC L207 is 757-269-7084
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Regina Phone: in LB228 is 306-585-4204
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Items for followup from previous meeting(s)
- Monitoring
- Send additional SiPMs to Athens for tests (Elton)
-
Measure stability of light intensity as a function of time.Measurement in progress, will report at a later meeting. - Jlab to generate a drawing of the plexiglass sheet to be used in next batch of tests.
-
Specify/clarify requirement for monitoring light uniformity into the Pb glass (Matt)
- FCAL
- Send IU the drawings for the FCAL welded frame. (Tim)
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring.
- Beam tests in Hall B (fall 2011) (John)
- FCAL
- Construction Status: mechanical, bases (notes from Matt)
- BCAL
- Construction Status: builds, mini module
- Fibres
- USM update
- Readiness Review: Testing of light sensors for Bcal
- Simulations/Reconstruction: Standalone MC, leakage at 12 degrees
- Any other business
Minutes
Attending:
- Announcements
- Review of Action Items
- Monitoring.
- Beam tests in Hall B (fall 2011) (John)
- FCAL
- Construction Status: mechanical, bases (notes from Matt)
- BCAL
- Construction Status: builds, mini module
- Fibres
- USM update
- Readiness Review: Testing of light sensors for Bcal
- Simulations/Reconstruction: Standalone MC, leakage at 12 degrees
- Any other business