Difference between revisions of "Nov 10, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Action Items from previous meetings)
Line 4: Line 4:
 
# Location and room for UFL connector for thermistor needs to be finalized. (Chris and Jim)
 
# Location and room for UFL connector for thermistor needs to be finalized. (Chris and Jim)
 
# Jack to update board with bias compensation circuitry (Jack)
 
# Jack to update board with bias compensation circuitry (Jack)
 +
# The RTDs will need a controller. Scot will see if Hall D has an existing one that can be used; otherwise one will be ordered.
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 17:45, 3 November 2011

Action Items from previous meetings

  1. Verify location of standoffs for circuit board. (Fernando)
  2. Location and room for UFL connector for thermistor needs to be finalized. (Chris and Jim)
  3. Jack to update board with bias compensation circuitry (Jack)
  4. The RTDs will need a controller. Scot will see if Hall D has an existing one that can be used; otherwise one will be ordered.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    1. Light source / optics
    2. Electronic boards
    3. Cabling
    4. Cooling plate
    5. Programming
    6. Other?
  5. SiPM testing (Ivan)
  6. Mechanical assembly (Scot)
  7. Mechanical (Jim)
  8. Mechanical drawings (Chuck)
  9. Temperature compensation (Jack)
  10. Preamp-summing (Fernando)

Minutes

Attending: