Difference between revisions of "Controls To Do List"

From GlueXWiki
Jump to: navigation, search
m
m
Line 5: Line 5:
 
*** Should we use an additional PLC in the hall?
 
*** Should we use an additional PLC in the hall?
 
*** Should we locate the main PLC in the hall?
 
*** Should we locate the main PLC in the hall?
 +
*** How much reliability do we need?  What are the consequences of occasional network loss?
 +
*** What are the mechanisms that cause loss of network connections?
 
** '''''Resolution'''''
 
** '''''Resolution'''''
 
*** Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself, so there doesn't seem to be a good reason to use ControlNet.
 
*** Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself, so there doesn't seem to be a good reason to use ControlNet.

Revision as of 17:10, 3 June 2011

  • Should we use ControlNet as well as Ethernet/IP in the hall?
    • Notes
      • Is there really a network reliability problem?
      • Would we have to run a copper line to the counting house?
      • Should we use an additional PLC in the hall?
      • Should we locate the main PLC in the hall?
      • How much reliability do we need? What are the consequences of occasional network loss?
      • What are the mechanisms that cause loss of network connections?
    • Resolution
      • Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself, so there doesn't seem to be a good reason to use ControlNet.
    • Still To Do
      • Test what happens if an Ethernet cable is unplugged.


  • When should we use a PC104 vs an IOC on a PC vs direct PLC control?
    • Notes
      • Should the FDC gas system use just PLC control and not use a PC104?
      • The FCAL CAN system probably requires an EPICS buffered virtual device running in a PC104.
      • Should we mix EPICS and PLC control in a single system?
    • Resolution
    • Still To Do
      • Need to see full FDC/CDC gas system P&I diagram.