Difference between revisions of "Controls To Do List"

From GlueXWiki
Jump to: navigation, search
m
m
Line 1: Line 1:
 
* '''Should we use ControlNet as well as Ethernet/IP in the hall?'''
 
* '''Should we use ControlNet as well as Ethernet/IP in the hall?'''
** '''Notes'''
+
** ''Notes''
 
*** Is there really a network reliability problem?
 
*** Is there really a network reliability problem?
 
*** Would we have to run a copper line to the counting house?
 
*** Would we have to run a copper line to the counting house?
 
*** Should we use an additional PLC in the hall?
 
*** Should we use an additional PLC in the hall?
 
*** Should we locate the main PLC in the hall?
 
*** Should we locate the main PLC in the hall?
** '''Resolution'''
+
** '''''Resolution'''''
 
*** Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself.
 
*** Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself.
  
  
 
* '''When should we use a PC104 vs an IOC on a PC vs direct PLC control?'''
 
* '''When should we use a PC104 vs an IOC on a PC vs direct PLC control?'''
** '''Notes'''
+
** ''Notes''
 
*** Should the FDC gas system use just PLC control and not use a PC104?
 
*** Should the FDC gas system use just PLC control and not use a PC104?

Revision as of 12:05, 3 June 2011

  • Should we use ControlNet as well as Ethernet/IP in the hall?
    • Notes
      • Is there really a network reliability problem?
      • Would we have to run a copper line to the counting house?
      • Should we use an additional PLC in the hall?
      • Should we locate the main PLC in the hall?
    • Resolution
      • Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself.


  • When should we use a PC104 vs an IOC on a PC vs direct PLC control?
    • Notes
      • Should the FDC gas system use just PLC control and not use a PC104?