===Should we use ControlNet as well as Ethernet/IP in the hall?===
+
====Should we use ControlNet as well as Ethernet/IP in the hall?====
** '''Notes'''
+
* '''Notes'''
*** Is there really a network reliability problem?
+
** Is there really a network reliability problem?
*** Would we have to run a copper line to the counting house?
+
** Would we have to run a copper line to the counting house?
*** Should we use an additional PLC in the hall?
+
** Should we use an additional PLC in the hall?
*** Should we locate the main PLC in the hall?
+
** Should we locate the main PLC in the hall?
** '''Resolution'''
+
* '''Resolution'''
*** Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself.
+
** Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself.
  
  
* When should we use a PC104 vs an IOC on a PC vs direct PLC control?
+
==== When should we use a PC104 vs an IOC on a PC vs direct PLC control?====
** '''Notes'''
+
* '''Notes'''
*** Should the FDC gas system use just PLC control and not use a PC104?
+
** Should the FDC gas system use just PLC control and not use a PC104?

Revision as of 12:00, 3 June 2011

Should we use ControlNet as well as Ethernet/IP in the hall?

  • Notes
    • Is there really a network reliability problem?
    • Would we have to run a copper line to the counting house?
    • Should we use an additional PLC in the hall?
    • Should we locate the main PLC in the hall?
  • Resolution
    • Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself.


When should we use a PC104 vs an IOC on a PC vs direct PLC control?

  • Notes
    • Should the FDC gas system use just PLC control and not use a PC104?