* Should we use ControlNet as well as Ethernet/IP?
 
* Should we use ControlNet as well as Ethernet/IP?
** Is there really a network reliability problem?
+
** '''Notes:'''
** Would we have to run a copper line to the counting house?
+
*** Is there really a network reliability problem?
** Should we use an additional PLC in the hall?
+
*** Would we have to run a copper line to the counting house?
** Should we locate the main PLC in the hall?
+
*** Should we use an additional PLC in the hall?
** '''Resolved:''' Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself.
+
*** Should we locate the main PLC in the hall?
 +
** '''Resolved'''
 +
*** Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself.
  
  
 
* When should we use a PC104 vs an IOC on a PC vs direct PLC control?
 
* When should we use a PC104 vs an IOC on a PC vs direct PLC control?
 
** Should the FDC gas system use just PLC control and not use a PC104?
 
** Should the FDC gas system use just PLC control and not use a PC104?

Revision as of 11:58, 3 June 2011

  • Should we use ControlNet as well as Ethernet/IP?
    • Notes:
      • Is there really a network reliability problem?
      • Would we have to run a copper line to the counting house?
      • Should we use an additional PLC in the hall?
      • Should we locate the main PLC in the hall?
    • Resolved
      • Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself.


  • When should we use a PC104 vs an IOC on a PC vs direct PLC control?
    • Should the FDC gas system use just PLC control and not use a PC104?