Difference between revisions of "Controls To Do List"

From GlueXWiki
Jump to: navigation, search
m
m
Line 3: Line 3:
 
** Should we use an additional PLC in the hall?
 
** Should we use an additional PLC in the hall?
 
** Should we locate the main PLC in the hall?
 
** Should we locate the main PLC in the hall?
 +
  
 
* When should we use a PC104 vs an IOC on a PC vs direct PLC control?
 
* When should we use a PC104 vs an IOC on a PC vs direct PLC control?
 
** Should the FDC gas system use just PLC control and not use a PC104?
 
** Should the FDC gas system use just PLC control and not use a PC104?

Revision as of 09:04, 3 June 2011

  • Should we use ControlNet as well as Ethernet/IP?
    • Would we have to run a copper line to the counting house?
    • Should we use an additional PLC in the hall?
    • Should we locate the main PLC in the hall?


  • When should we use a PC104 vs an IOC on a PC vs direct PLC control?
    • Should the FDC gas system use just PLC control and not use a PC104?