Difference between revisions of "Coil Test Weekly Meeting 8-Apr-2011"
From GlueXWiki
m |
|||
Line 21: | Line 21: | ||
** additional licenses and modules | ** additional licenses and modules | ||
* New VME-based fast DAQ system | * New VME-based fast DAQ system | ||
− | ** hardware | + | ** hardware status |
− | ** software | + | ** software status |
+ | ** protecting VME board from over-voltage | ||
* Other testing with coil 3 | * Other testing with coil 3 | ||
** VXS/VME crates in B field | ** VXS/VME crates in B field |
Latest revision as of 09:01, 8 April 2011
Solenoid Coil Test Weekly Meeting
Location and Time
- Fri 8-Apr-2011 9:30 am ARC 231
Agenda
- New halldusers password
- Coil 3 installation status
- Improvements needed for coil 3
- Danfysik power transistor
- quench detector
- document trip chains
- trip sequence diagnosis system
- slow dump
- new wiring
- PLC system improvements
- additional licenses and modules
- New VME-based fast DAQ system
- hardware status
- software status
- protecting VME board from over-voltage
- Other testing with coil 3
- VXS/VME crates in B field
- SiPM tests
- others?
- To-do list for the next coil
- measure UPS lifetime under operating conditions
- Coil 2 repair status
- IRMIS
- Preparing for moving into the hall