Difference between revisions of "Coil Test Weekly Meeting 8-Apr-2011"

From GlueXWiki
Jump to: navigation, search
 
m
 
Line 21: Line 21:
 
** additional licenses and modules
 
** additional licenses and modules
 
* New VME-based fast DAQ system
 
* New VME-based fast DAQ system
** hardware
+
** hardware status
** software
+
** software status
 +
** protecting VME board from over-voltage
 
* Other testing with coil 3
 
* Other testing with coil 3
 
** VXS/VME crates in B field
 
** VXS/VME crates in B field

Latest revision as of 09:01, 8 April 2011

Solenoid Coil Test Weekly Meeting

Location and Time

  • Fri 8-Apr-2011 9:30 am ARC 231


Agenda

  • New halldusers password
  • Coil 3 installation status
  • Improvements needed for coil 3
    • Danfysik power transistor
    • quench detector
    • document trip chains
    • trip sequence diagnosis system
    • slow dump
    • new wiring
  • PLC system improvements
    • additional licenses and modules
  • New VME-based fast DAQ system
    • hardware status
    • software status
    • protecting VME board from over-voltage
  • Other testing with coil 3
    • VXS/VME crates in B field
    • SiPM tests
    • others?
  • To-do list for the next coil
    • measure UPS lifetime under operating conditions
  • Coil 2 repair status
  • IRMIS
  • Preparing for moving into the hall