Coil Test Weekly Meeting 8-Apr-2011

From GlueXWiki
Jump to: navigation, search

Solenoid Coil Test Weekly Meeting

Location and Time

  • Fri 8-Apr-2011 9:30 am ARC 231


Agenda

  • New halldusers password
  • Coil 3 installation status
  • Improvements needed for coil 3
    • Danfysik power transistor
    • quench detector
    • document trip chains
    • trip sequence diagnosis system
    • slow dump
    • new wiring
  • PLC system improvements
    • additional licenses and modules
  • New VME-based fast DAQ system
    • hardware status
    • software status
    • protecting VME board from over-voltage
  • Other testing with coil 3
    • VXS/VME crates in B field
    • SiPM tests
    • others?
  • To-do list for the next coil
    • measure UPS lifetime under operating conditions
  • Coil 2 repair status
  • IRMIS
  • Preparing for moving into the hall