'''Location and Time'''
 
'''Location and Time'''
  
* Thu 14-Oct-2010 9:30am ARC 428
+
* Thu 14-Oct-2010 9:30 am ARC 428
  
  
 
'''Agenda'''
 
'''Agenda'''
  
* Still more new coil test group members, mainly in consultant/oversight capacity
+
* Still more coil test group members, mainly in consultant/oversight capacity
 
** Bill Vulcan
 
** Bill Vulcan
 
* OSP docs and writing assignments - all
 
* OSP docs and writing assignments - all
** What's left?
+
** Status
* Technical web page - Mark S
+
** Split into cryo and electrical
 +
** What's left to do?
 +
* Hall D Technical web page - Mark S
 
* Hall probe with fast readout for detection of turn-to-turn shorts- Mark S
 
* Hall probe with fast readout for detection of turn-to-turn shorts- Mark S
 
* Pager for coil test on-call person - Elliott
 
* Pager for coil test on-call person - Elliott
Line 21: Line 23:
 
* Do we need He vessel LHe level in interlock system - George, Elliott
 
* Do we need He vessel LHe level in interlock system - George, Elliott
 
** backup to liquid level measurements?
 
** backup to liquid level measurements?
* Narrative/Test Plan - Josh
 
** addition of check valve and relief valve in lead flow system
 
** phased cooldown of LN2 shields
 
** any other changes?
 
 
* Magnet power supply and interlock commissioning - Mark S
 
* Magnet power supply and interlock commissioning - Mark S
** latest status
+
** shunt
** adding a shunt to the interlock system
+
** ground fault detection
** adding ground fault detection
+
 
* Controls racks - Scot
 
* Controls racks - Scot
 
** strain gauge interlock
 
** strain gauge interlock
Line 35: Line 32:
 
* PLC programming/testing status - Mark W
 
* PLC programming/testing status - Mark W
 
** UPS interlock
 
** UPS interlock
** guard shack
 
 
** what's left?
 
** what's left?
 
** backup PLC programmer, file locations, license key
 
** backup PLC programmer, file locations, license key
 
* EPICS <--> PLC communications - Hovanes
 
* EPICS <--> PLC communications - Hovanes
** PV list from Jonathan and PLC tags
+
** connection to guard shack and notification conditions
** connection to guard shack
+
** under what circumstances do we notify the guard shack?
+
 
* HMI and [http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes
 
* HMI and [http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes
 
** current status
 
** current status
 
** tutorial?
 
** tutorial?
 
* Coil repair status - George
 
* Coil repair status - George
* Solenoid review 25-26 Oct
+
* Solenoid reviews 25-26 Oct and 7-Dec
 +
* Purchase of another PLC and Ethernet module - Elliott
 +
* Compatibility of other controls devices with PLC - Elliott
 
* Preparations for testing next coil - George, Scot, Elliott
 
* Preparations for testing next coil - George, Scot, Elliott
** hardware purchase/reuse strategy
 
 
** update P&I
 
** update P&I
 
** splices
 
** splices
Line 55: Line 50:
 
** downstream yoke spacers
 
** downstream yoke spacers
 
** controls racks rewiring
 
** controls racks rewiring
 +
** connectors on next coil
 +
** what else?

Latest revision as of 11:08, 14 October 2010

Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 14-Oct-2010 9:30 am ARC 428


Agenda

  • Still more coil test group members, mainly in consultant/oversight capacity
    • Bill Vulcan
  • OSP docs and writing assignments - all
    • Status
    • Split into cryo and electrical
    • What's left to do?
  • Hall D Technical web page - Mark S
  • Hall probe with fast readout for detection of turn-to-turn shorts- Mark S
  • Pager for coil test on-call person - Elliott
  • Installation status - all
    • what's left?
    • when do we give two weeks notice to Errol?
  • Do we need He vessel LHe level in interlock system - George, Elliott
    • backup to liquid level measurements?
  • Magnet power supply and interlock commissioning - Mark S
    • shunt
    • ground fault detection
  • Controls racks - Scot
    • strain gauge interlock
    • UPS interlock
    • anything else?
  • PLC programming/testing status - Mark W
    • UPS interlock
    • what's left?
    • backup PLC programmer, file locations, license key
  • EPICS <--> PLC communications - Hovanes
    • connection to guard shack and notification conditions
  • HMI and EWEB programming - Yi, Hovanes
    • current status
    • tutorial?
  • Coil repair status - George
  • Solenoid reviews 25-26 Oct and 7-Dec
  • Purchase of another PLC and Ethernet module - Elliott
  • Compatibility of other controls devices with PLC - Elliott
  • Preparations for testing next coil - George, Scot, Elliott
    • update P&I
    • splices
    • yoke location
    • piping adaptors
    • downstream yoke spacers
    • controls racks rewiring
    • connectors on next coil
    • what else?